For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 11-2.29 — ESTIMATE OF INSTALLATION COSTS

Hayward Municipal Code (Supp. No. 28, Update 2: codified through Ordinance No. 26-08, adopted August 18, 2026) · Hayward Municipal Code § 11-2.29

Corpus is an independent public-information project, not the official City of Hayward website. Stable reference: corpuslaw.us/code/8362660c-ef3c-4608-aa3a-e28955069be3

SEC. 11-2.29 - ESTIMATE OF INSTALLATION COSTS.

Upon receipt of the plans and specifications, if the Director of Public Works or authorized representative determines that the City can install the water system using City employees, the Director of Public Works shall cause an estimate of installation costs to be prepared, including (1) material costs, plus five percent (5%) thereof for storage and handling; (2) labor costs; (3) engineering costs; and (4) administrative costs. Such plans, specifications and cost estimates shall be furnished to applicant who may elect to proceed with the installation or abandon the same. In the case applicant abandons, all deposits made by applicant less engineering costs shall be refunded to the applicant.

Ask a question about Hayward law

Corpus searches the Hayward sections it holds and shows the ones that match, with their citations. Free, no sign-in.