§ 11-5.38 — STORMWATER TREATMENT MEASURES REQUIRED

Hayward Municipal Code (Supp. No. 28, Update 2: codified through Ordinance No. 26-08, adopted August 18, 2026) · Hayward Municipal Code § 11-5.38

Corpus is an independent public-information project, not the official City of Hayward website. Stable reference: corpuslaw.us/code/a1ea016b-c258-4b1b-bb82-4007f08780eb

SEC. 11-5.38 - STORMWATER TREATMENT MEASURES REQUIRED.

(a) All Regulated Projects shall include Stormwater Treatment Measures to reduce water quality impacts of urban runoff from the entire project site for the life of the project. Such measures shall be in accordance with the guidelines contained in the City of Hayward's Site Design Standards and Guidance, including but not limited to flow duration and volume control requirements. All Regulated Projects shall also abide by the rules set forth in the NPDES municipal stormwater discharge permit issue to the City by the California Regional Water Quality Control Board, San Francisco Bay Region. Furthermore, all other development projects deemed appropriate by the City, are required to apply the City of Hayward's Source Control Measures List to each respective project. (b) All Significant Redevelopment Projects shall include Stormwater Treatment Measures to reduce water quality impacts of urban runoff for the life of the project. (1) Significant Redevelopment Projects that result in an increase of, or replacement of, more than fifty percent (50%) of the impervious surface of a previously existing development shall include Stormwater Treatment Measures sufficient to reduce water quality impacts of urban runoff from the entire site for the life of the project. (2) Significant Redevelopment Projects that result in an increase of, or replacement of, fifty percent (50%) or less of the impervious surface of a previously existing development shall include Stormwater Treatment Measures sufficient to reduce water quality impacts of urban runoff from the increased or replaced portion of the site for the life of the project. (c) Stormwater Treatment Measures must be incorporated into all applicable plan documents. All plan documents and construction activities are subject to inspection and approval by the City. (d) No final building or occupancy permit shall be issued without the written certification of the Director of Public Works or his or her designee that the requirements of this Article have been satisfied. Such certification shall be in the form prescribed by the City and shall not be issued without payment of all applicable fees, if any, which may be imposed for administration of this Article.

(Amended by Ordinance 23-05, § 1(Att. III-a), adopted April 18, 2023)

Ask a question about Hayward law

Corpus searches the Hayward sections it holds and shows the ones that match, with their citations. Free, no sign-in.