§ 3-8.10 — NEW STORAGE FACILITIES
Hayward Municipal Code (Supp. No. 28, Update 2: codified through Ordinance No. 26-08, adopted August 18, 2026) · Hayward Municipal Code § 3-8.10
Corpus is an independent public-information project, not the official City of Hayward website. Stable reference: corpuslaw.us/code/f375a586-4af0-4189-9814-39ca82ac3800
SEC. 3-8.10 - NEW STORAGE FACILITIES.
(a) No person, firm or corporation shall construct or install any new storage facility until a permit or approval has been issued pursuant to this Article. (b) Monitoring Capability. All new storage facilities intended for the storage of hazardous materials which are liquids or solids at standard temperature and pressure (STP) shall be designed and constructed with a monitoring system capable of detecting that the hazardous material stored in the primary containment has entered the secondary containment. Visual inspection of the primary containment is the preferred method; however, other means of monitoring may be required by City. Where secondary containment may be subject to the intrusion of water, a means of monitoring for such water shall be provided. Whenever monitoring devices are provided, they shall, where applicable, be connected to attention-getting visual or audible alarms or both such devices. (c) Containment requirements. Primary and secondary levels of containment shall be required for all new storage facilities intended for the storage of hazardous materials which are liquids or solids at standard temperature and pressure (STP), unless exempted by City. (1) All primary containment shall be product-tight. (2) Secondary containment: (i) All secondary containment shall be constructed of materials of sufficient thickness, density, and composition so as not to be structurally weakened as a result of contact with the released hazardous materials and so as to be capable of containing hazardous materials released from a primary container for a period of time equal to or longer than the maximum anticipated time sufficient to allow recovery of the discharged hazardous material. (ii) In the case of an installation with one (1) primary container, the secondary containment shall be large enough to contain at least one hundred ten percent (110%) of the volume of the primary container. (iii) In the case of a storage facility with multiple primary containers, the secondary container shall be large enough to contain one hundred fifty percent (150%) of the volume of the largest primary container placed in it, or ten percent (10%) of the aggregate internal volume of all primary containers in the storage facility, whichever is greater. (iv) If the storage facility is open to rainfall, then the secondary containment must be able to additionally accommodate the volume of a twenty-four (24) hour rainfall as determined by a twenty-five (25) year storm history. (3) Laminated, coated, or clad materials shall be considered single-walled and shall not be construed to fulfill the requirements of both primary and secondary containment. (d) Variance from requirement for secondary containment. (1) A variance from the requirement for secondary containment for an underground storage facility may be granted upon a written finding by the Fire Chief, which has been reviewed and approved by the City Council, that based on the special circumstances : (i) The requirement of secondary containment creates an unusual and particular hardship; and (ii) An equivalent degree of protection is provided by the proposed alternative; and (iii) The proposed alternative has been appropriately certified as providing an equivalent degree of protection, by an independent consultant regained in accordance with Section 3-8.05, or has been specified as potentially appropriate for a variance in the guidelines approved pursuant to Section 3-8.69. (2) The City Council shall consider the variance at a public meeting, at which oral or written presentation on the matter may be made. A notice which includes a statement that a variance from secondary containment for hazardous materials will be considered, and which specifies the address of the facility seeking the variance, and the time and place of the meeting shall be given in the following manner: (i) The City Clerk shall cause a copy of the notice to be published once in a newspaper of general circulation in the City, not less than ten (10) days prior to the meeting; and (ii) The City Clerk shall cause a copy of the notice to be mailed at least ten (10) days prior to the meeting to any party who files a written request with the City Clerk for mailed notice of meetings at which such variances are to be considered. Such written request for notice shall be valid for one (1) year from the date on which it is filed unless a renewal request is filed. Renewal requests for such mailed notices shall be filed on or before April 1st of each year. (e) Variance from construction and Monitoring Requirements. Underground storage tanks may be granted a variance from the standards for construction and monitoring set forth in this subsection, other than from the requirement for secondary containment, only upon a written finding by the Fire Chief that the applicant has demonstrated by clear and convincing evidence: (1) That because of special circumstances not generally applicable to other property or facilities, including size, shape, design, topography, location, or surroundings, the strict application of the standards of this Article would be unnecessary to adequately protect the soil and beneficial uses of the waters of the state from an unauthorized release; or (2) That strict application of the standards of this Article would create practical difficulties not generally applicable to other facilities or property; and that the proposed alternative will adequately protect the soil and beneficial uses of the waters of the state from an unauthorized release. (f) Overfill Protection. Means of overfill protection may be required for any primary container. This may be an overfill prevention device or an attention-getting high level alarm or both such devices. (g) Separation of Materials. Materials that in combination may cause a fire or explosion, or the production of a flammable, toxic, or poisonous gas, or the deterioration of a primary or secondary container shall be separated in both the primary and secondary containment so as to avoid intermixing. (h) Drainage System. Drainage of precipitation from within a storage facility containing hazardous materials which are liquids or solids at STP shall be controlled in a manner approved by the City so as to prevent hazardous materials from being released. No drainage system will be approved unless the flow of the drain can be controlled. (i) Piping. (1) All piping, valves and fittings shall be designed for working pressures and structural stresses to which they may be subjected. They shall be of steel or other material suitable for use with the product being handled. (2) All piping both aboveground and underground shall be protected against damage to the integrity of the material of which the piping is made in the manner determined necessary and appropriate by the Fire Chief. (3) All piping both aboveground and underground shall have secondary containment as provided in subsection (c) of this section except that the secondary containment of piping may lead back to the container's secondary containment. (4) All aboveground piping shall be properly labeled in accordance with recognized standards which are approved by the Fire Chief.
Ask a question about Hayward law
Corpus searches the Hayward sections it holds and shows the ones that match, with their citations. Free, no sign-in.
