For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 7-2.00 — DEFINITIONS

Hayward Municipal Code (Supp. No. 28, Update 2: codified through Ordinance No. 26-08, adopted August 18, 2026) · Hayward Municipal Code § 7-2.00

Corpus is an independent public-information project, not the official City of Hayward website. Stable reference: corpuslaw.us/code/23b481c7-0fb1-435f-ad44-900b2bf084a5

SEC. 7-2.00 - DEFINITIONS.

For the purposes of this Article, certain words and phrases are defined and certain provisions are to be construed as herein set out, unless it shall be apparent from the context that a different meaning is intended. CITY COMMUNICATIONS INFRASTRUCTURE. City communications infrastructure shall mean conduits, pull boxes, and other related facilities that are deployed by the City in furtherance of the strategic and operational goals outlined in the City of Hayward Fiber Optic Master Plan. CITY COMMUNICATION INFRASTRUCTURE REQUIREMENTS. City Communication Infrastructure Requirements shall mean the Public Works Department's adopted standards for implementing the Public Works Department's participation in excavation projects involving the installation of City Communications Infrastructure. The City Communication Infrastructure Requirements are kept on file in the City Clerk's Office and available for public review on request. CONDUIT. Conduit shall mean a pipe or tube through which water, waste water or gas is conveyed, or which is used to protect electrical or communications cables. EMERGENCY STREET CUT. Emergency street cut shall mean any street cut which must be made to repair a defective or broken underground facility, the condition of which facility constitutes an evident and immediate hazard to life, health, or property, and it is impractical to secure a permit before work is commenced. EXCAVATION COSTS. Excavation costs shall mean all construction costs relating to the excavation, backfill, paving, marking, and other costs associated with restoring a City street to its pre-excavation state. This will include all associated labor and permitting costs. INCREMENTAL COST. Incremental cost shall mean the cost associated with adding City communications infrastructure to an excavation project, including the cost of the materials needed by the City and any additional labor costs. MAJOR PROJECT. Major project shall mean the installation or replacement of any underground facility other than a service from an existing main to a single user. MICRO-TRENCH. Micro-Trench shall mean the fiber optic construction technique that involves cutting a narrow trench or groove of one to two inches wide and up to two feet deep, to hold conduits for fiber or direct buried fiber. STANDARD CITY COMMUNICATION INFRASTRUCTURE SPECIFICATIONS. Standard City Communications Infrastructure Specifications shall mean the type, size, and quantity of conduits, cross section, the size and frequency of pull boxes, and any other facilities that the Public Works Department determines are necessary to serve the City's Communications needs. The Standard City Communication Infrastructure Specifications are kept on file in the City Clerk's Office and available for public review on request. STREET CUT. Street cut shall mean the action of or the result of opening, tearing up, excavating, repairing, installing, adding to, removing, or otherwise altering any portion of any public roadway, street, thoroughfare, sidewalk, curb, gutter, or driveway, or any other such facility existing within a public right-of-way area for any purpose whatsoever. TRENCH. Trench shall mean a form of excavation to install underground infrastructure or utilities such as fiber optic cables, gas or water mains or electric lines. Such excavation is different from micro-trenching in that different equipment is used, the resulting opening in the ground is wider and deeper, and greater site preparation, clean-up and restoration activities are required. Any excavation that is not a micro-trench as defined in this Article is a Trench. UNDERGROUND FACILITY. Underground facility shall mean any pipe, conduit, tile, or other material installed within and below the surface of any public roadway, street, sidewalk, thoroughfare, or other place.

(Amended by Ordinance 17-09, adopted June 20, 2017; amended by Ordinance 19-01, adopted Jan. 15, 2019)

Ask a question about Hayward law

Corpus searches the Hayward sections it holds and shows the ones that match, with their citations. Free, no sign-in.