For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 7-4.20 — APPLICATION REQUIRED FOR WIRELESS COMMUNICATIONS FACILITY PUBLIC RIGHT-OF-WAY PERMIT

Hayward Municipal Code (Supp. No. 28, Update 2: codified through Ordinance No. 26-08, adopted August 18, 2026) · Hayward Municipal Code § 7-4.20

Corpus is an independent public-information project, not the official City of Hayward website. Stable reference: corpuslaw.us/code/40f79be5-d3d2-4ce3-9368-fa08a42e6a19

SEC. 7-4.20 - APPLICATION REQUIRED FOR WIRELESS COMMUNICATIONS FACILITY PUBLIC RIGHT-OF-WAY PERMIT.

(a) The applicant for a WCF PROW Permit shall submit an application on a City approved form to the Public Works Department and pay any required fee as established by City Council resolution in its Master Fee Schedule. The application must include all required information. Applications shall be rejected if all attachments are not included at the time of submittal. The Director has the discretion to require applications be submitted by appointment only and to set the frequency and number of appointments that will be granted each day. (b) In addition to any other application requirements, all utilities granted access to the right-of-way by the California Public Utilities Commission (CPUC) shall file with the City of Hayward a copy of their certificate of public necessity and convenience (CPCN) or submit a copy of said CPCN with each application for a wireless facility. The applicant shall also provide evidence that the applicant holds all current licenses and registrations from the FCC and any other applicable regulatory bodies where such license(s) or registration(s) are necessary to provide wireless services utilizing the proposed wireless communications facility. (c) For any change to an existing facility, the Director may require documentation to establish whether the change to the site is substantial, whether new Antennas are added or whether the change will result in an increase in EMF output. (d) For a Minor Modification or a Modification, the applicant shall submit an application on a City approved form to the Public Works Department. The application shall include: (1) Electronic plans (in pdf format and electronic GIS-compatible file format) to sufficient detail to include and identify: i. Title sheet. ii. Site plan, showing: 1. The exact location and route requested for applicant's proposed facilities, including other improvements in the area; 2. If excavation is required the plans must include the location and depth of all overhead and underground public utility, cable, water, sewer drainage, fiber optic, and other facilities in the public right-of-way along the proposed route; 3. The location(s), if any, for interconnection with the facilities of any other parties; and 4. The specific trees, structures, improvements, facilities and obstructions, if any, that applicant proposes to temporarily or permanently remove or relocate. iii. If installing additional equipment or changing equipment on the pole include load calculations. iv. Details of equipment to be installed and the proposed location(s). v. Include all existing and proposed improvements in the project area. vi. The site shall be designed per Design Standards included in these guidelines. (2) Photo or computer simulations representing the above ground facility before and after installation (include any pedestals, vents, conduit and exposed cable). (3) Copy of permit and approved plans for the existing facility. (4) Completed wireless site evaluation form with new equipment signed by certifying licensed engineer. (e) For a Co-location Application, the applicant shall submit an application on a City approved form to the Public Works Department. The application must be submitted per this Policy and include all required attachments, including: (1) Electronic plans (in pdf format and electronic GIS-compatible file format) to sufficient detail to include and identify: i. Title sheet. ii. Site plan. If excavation is required the plans must include the size, depth and location of all subterranean infrastructures in the excavation area. iii. Load calculations. iv. Details of equipment to be installed and the proposed location(s). v. Include all existing and proposed improvements in the project area. vi. The site shall be designed in accordance with any Design Standards in this Article. (2) Photo or computer simulations representing the above ground facility before and after installation (include any pedestals, vents, conduit and exposed cable). (3) Completed wireless site evaluation form signed by certifying licensed engineer that includes the combined emissions of all antenna sectors (old and new). (f) For all new wireless communications facilities and substantial changes to existing wireless communications facilities not covered under Section 6409 of the Spectrum Act (codified at 47 U.S.C. 1455), the applicant shall submit an application on a City approved form to the Public Works Department. The application shall include: (1) Title Sheet showing: i. The name, address and telephone number of both the applicant and the owner of the telecommunication facility or WCF; ii. The name, address and telephone number of the responsible person whom the City may contact at any time concerning the telecommunication facility or WCF; (2) Legal authority to occupy and use for the purpose mentioned in the application, the streets, alleys, sidewalks or other public places where the excavation, placement, location or installation of telecommunication facilities or WCF is proposed to be made; (3) Electronic plans (in pdf format and electronic GIS-compatible file format) to sufficient detail to identify and include: i. The pole number(s), address, and latitude/longitude GPS coordinates of the location of the pole or poles; ii. Site plan, showing: 1. The exact location and route requested for applicant's proposed facilities, including other improvements in the area; 2. If excavation is required the plans must include the location and depth of all overhead and underground public utility, cable, water, sewer drainage, fiber optic, and other facilities in the public way along the proposed route; 3. The location(s), if any, for interconnection with the facilities of any other parties; and 4. The specific trees, structures, improvements, facilities and obstructions, if any, that applicant proposes to temporarily or permanently remove or relocate. iii. Load calculations. iv. Details of equipment to be installed and the proposed location/s. v. Include all existing and proposed improvements in the project area. vi. The site shall be designed in accordance with the Design Standards included in this Chapter. (4) Engineering certification demonstrating compliance with all existing RF emission standards. The technical information submitted must include support/analysis to justify the proposed location and height of the telecommunication facility or WCF; (5) Photo or computer simulations representing the above ground facility before and after installation (include any pedestals, vents, conduit and exposed cable); (6) A construction plan and schedule, to include start and end dates and phasing, as required by the City, including additional telecommunication facility or WCF locations which the applicant plans to install within five years from the date of application submittal. In the event an Applicant states it does not know its construction plans for a five-year period the Applicant must provide a declaration stating that fact and shall provide its construction plans as known in Applicants management and engineering planning processes, which shall be for a reasonable period of time in no event less than two years; (7) If the applicant's proposed facility involves installing a replacement structure (e.g., a pole) in the public right-of-way and attaching additional facilities, or installing a facility on a pole owned by a third party, the applicant shall also provide a signed copy of the license, lease, pole attachment agreement, or whatever authorizations are required for the placement of the wireless facility at the location proposed, including proof that the applicant is authorized by the owner of the structure to install and operate the proposed wireless facility on the structure. Such submissions need not disclose financial terms; (8) If the site is adjacent to a property or area that is included in or eligible for inclusion in the National Register of Historic Places, an Environmental Assessment as defined by the National Environmental Protection Act; (9) All applicants shall submit a justification study which includes the rationale for selecting the proposed use; if applicable, a detailed explanation of the coverage gap that the proposed use would serve; and how the proposed use is the least intrusive means for the applicant to provide wireless service. Said study shall include all existing structures and/or alternative sites evaluated for potential installation of the proposed facility and why said alternatives are not a viable option; (10) A coverage map indicating the area which will be served by the proposed telecommunication facility or WCF; and (11) A non-refundable application and processing fee, in an amount established by resolution of the City Council to defray the City's costs to process the application and to inspect the telecommunication facility or WCF. (g) In the event a state or federal law prohibits the collection of any information required by this Section, the Director is authorized to omit or modify the city's application form to comply with applicable law. (h) Pre-submittal Requests. (1) The applicant may request a pre-application consultation/submittal to the City. This consultation is for the applicant to ask questions, receive guidance on specific requirements of this Article, and receive verbal feedback on specific elements to assist in the design of their site. Multiple proposal options may be provided for the same location under one Pre-submittal application. (2) Pre-submittal Application request is to be made on a City approved form to the Public Works Department and shall include any required fee as established by City Council resolution in its Master Fee Schedule for each submittal. The form shall include a tolling agreement that states the applicant's understanding that the meeting in no way constitutes review of their application and that any applicable "shot-clock," or limits on application review time provided under state or federal law, regarding their project will not begin until an official application has been submitted. (3) The pre-application request shall include: i. Electronic plans (in pdf format) to include: 1. Site plan; 2. Details of equipment to be installed and the proposed location(s); 3. Include all existing and proposed improvements in the project area; and 4. The site shall be designed per Hayward Municipal Code Design Standards included in these guidelines. ii. Photo or computer simulations representing the above ground facility before and after installation (include any pedestals, vents, conduit and exposed cable). (4) Collaboration. Once conceptual review has been completed, the Public Works Department and the applicant may communicate to address comments and resolve issues identified in advance of an application being submitted. When necessary, at the request of the applicant, City Staff may conduct site visits with the applicant to address and/or resolve specific issues related to the site. The applicant may request a meeting with City Staff to review and discuss conceptual review comments, subject to any applicable fees.

Ask a question about Hayward law

Corpus searches the Hayward sections it holds and shows the ones that match, with their citations. Free, no sign-in.