§ 9-8.100.035 — ELECTRIC READINESS IN NEWLY CONSTRUCTED NON-RESIDENTIAL BUILDINGS
Hayward Municipal Code (Supp. No. 28, Update 2: codified through Ordinance No. 26-08, adopted August 18, 2026) · Hayward Municipal Code § 9-8.100.035
Corpus is an independent public-information project, not the official City of Hayward website. Stable reference: corpuslaw.us/code/624c70c7-ef6c-45b4-a182-36d906c77eb8
SEC. 9-8.100.035 - ELECTRIC READINESS IN NEWLY CONSTRUCTED NON-RESIDENTIAL BUILDINGS.
A. Where Fuel Gas Infrastructure is installed as part of a Newly Constructed Non-Residential Building, the building shall be required to have sufficient electrical capacity, including reserved circuit breakers, electrical conduit, subpanels, panels, switchboards, and transformers, to facilitate future full building electrification in accordance with the California Electrical Code and manufacturer specifications, in addition to all other code requirements, and shall be depicted on the construction drawings. B. Physical space for future electric heating appliances, including equipment footprint and any associated ducting, shall be depicted on the construction drawings. The footprint necessary for future electric heating appliances may overlap with non-structural partitions and with the location of currently designed combustion equipment.
(Amended by Ordinance 23-06, § 2, adopted June 20, 2023)
Ask a question about Hayward law
Corpus searches the Hayward sections it holds and shows the ones that match, with their citations. Free, no sign-in.
