Sec. 2-6-4. - Broadband batch permit processing eligibility.
Broadband projects shall be eligible for batch permit processing if they are substantially similar, in that each facility is nearly identical in terms of equipment and general design. A. Equipment. Broadband projects will be considered nearly identical in terms of equipment if staff determines that each project consists of the following: 1. The same type of support structure. 2. The same number of equipment, and equipment size including, but not limited to, antennas, utility boxes, RDUs, dishes, and more. 3. Equipment mounted at equal height or within five percent (maximum) below the highest mounted equipment in the batch. 4. The same amount of support wiring, including electrical connection, fiber optics, coaxial, cable, etc., as dictated by the length to be installed. B. General design. Broadband projects will be considered nearly identical in terms of general design if staff determines that each project consists of the following: 1. The same materials and colors. 2. Lease area square footage is equal to or within five percent (maximum) less than the largest lease area in the batch. 3. Square footage equal to or within five percent (maximum) less than the largest amount of square footage to be excavated, trenched or graded in the batch. 4. The same general equipment layout.
(Ord. No. 24-15, Exh. A, 9-24-24)
Ask a question about Irvine law
Corpus searches the Irvine sections it holds and shows the ones that match, with their citations. Free, no sign-in.