Sec. 5-10-137. - Erosion and sediment control and water quality requirement systems.
A. Prior to the issuance of grading permits, an erosion and sediment control plan for the proposed development shall be approved by the Chief Building Official. The Chief Building Official may require that grading operations and project designs be modified if delays occur which incur weather-generated problems or other conditions not considered at the time the permit was issued, and further subject to provisions of Section 5-10-122, "Denial of grading permit," of this chapter. B. The faces of cut and fill slopes shall be prepared and maintained to control against erosion. This control may consist of effective planting. The protection for the slopes shall be installed as soon as practicable and prior to calling for final approval. C. Temporary, semi-permanent, and/or permanent erosion and sediment control devices such as desilting basins, gravel bags, check dams, cribbing, riprap or other devices or methods, as required by the approved erosion and sediment control plan, shall be fully implemented. D. Paved streets, sidewalks and other improvements shall be maintained in a neat and clean condition free of loose soil, construction debris and trash. Street sweeping or other equally effective means shall be used on a regular basis to prevent wind, vehicle tracking or storm flows from carrying sediment and debris outside the project boundaries. Watering to clean streets is prohibited. E. Unless otherwise approved by the Chief Building Official, the owner shall be required to retain a civil engineer who will be responsible for inspecting the erosion and sediment control systems, and for the initial approval of installation of permanent and semi-permanent erosion and sediment control devices during each rainy season until the work authorized by the grading permit is given final approval. The owner shall retain the civil engineer to periodically review the field conditions and modify, as needed to ensure effectiveness, the erosion and sediment control plan during the rainy season. Installation and maintenance of all erosion and sediment control devices shall be the responsibility of the owner. The civil engineer or other qualified individual who prepared the grading plan and the erosion and sediment control plan shall be responsible for inspection and any necessary plan revisions during the rainy season. F. Desilting facilities shall be provided at drainage outlets from the graded site. G. Desilting basins shall be designed to provide a minimum desilting capacity equal to the current City of Irvine standards. H. Desilting basins shall be constructed around the perimeter of projects whenever feasible when it provides improved maintenance access from paved roads during wet weather. I. Desilting basins constructed of compacted earth shall be compacted to a relative compaction of 90 percent of maximum density. A soil engineering report, prepared by the soil engineer, which includes the type of field testing performed, location and results of testing shall be submitted to the Chief Building Official for approval upon completion of the desilting basins. J. Disturbed site areas that are not complete and that are not being actively graded shall be fully protected from erosion with appropriate best management practices (BMPs) deployed. Materials needed to install standby erosion and sediment control BMPs sufficient to completely protect other exposed portions of the site from erosion and to prevent sediment discharges shall be stored on site and shall be deployed prior to a storm event. K. Pursuant to the Statewide general construction permit, there shall be a "rain event" action plan and the ability to deploy standby erosion and sediment control BMPs as needed to completely protect the exposed portion of the site within 48 hours of a predicted storm event (a predicted storm event is defined as a forecasted, 50 percent chance of rain). L. Erosion protection shall include effective planting of all slopes in excess of five feet high unless otherwise approved by the Chief Building Official. Slopes exceeding 15 feet high may require an adequate irrigation system, as determined by the Chief Building Official. Protection for the slopes shall be installed as soon as practicable, which may be prior to rough grade approval. Effective planting shall be installed, fully germinated and effectively cover the required slopes prior to final approval unless otherwise approved by the Chief Building Official. M. The erosion and sediment control provisions shall take into account drainage patterns during the current and future phases of grading. N. Graded areas around the tract perimeter must drain away from the face of slopes at the conclusion of each working day. O. In addition to the requirements specified above, the permittee shall perform all work in accordance with the water quality requirements. P. Any violation of an applicable federal or State-issued stormwater permit, or failure to conform to the City's water quality requirements prepared pursuant to such a permit or pursuant to this chapter or to Title 6, Division 8, Chapter 3, or failure to comply with stormwater related provisions of a City-issued grading permit or grading plan prepared to secure such a permit, is also a violation of this chapter.
(Ord. No. 03-22, § 1, 6-24-03)