Sec. 5-10-141. - Responsibilities of the responsible professionals.

A. It shall be the responsibility of the civil engineer, architect or other qualified individual who prepares the grading plan approved by the Chief Building Official to incorporate all recommendations from the soil engineering and engineering geology reports into the grading plan. Civil engineer, architect, or other qualified individual shall also be responsible for the professional inspection and approval of the grading within that person's area of technical specialty. This responsibility shall include, but need not be limited to, inspection and approval as to the establishment of line, grade and drainage of the development area. The project civil engineer and/or general contractor shall act as the coordinating agent in the event the need arises for liaison between the project professional, grading contractor, and the Chief Building Official. The civil engineer or other qualified person who prepares and signs the grading plan shall also be responsible for the preparation of revised plans, revised erosion and sediment control plans, and the submission of as-graded grading plans when required by the Chief Building Official upon completion of the work. B. Soil engineering and engineering geology reports shall be required as specified in Section 5-10-120, "Soil engineering, engineering geology and seismicity reports," of this Code. During grading, all necessary reports, compaction data, soil engineering and engineering geology recommendations shall be submitted to the owner by the soil engineer and engineering geologist. The owner shall submit copies of the report to the civil engineer and two copies of all reports to the Chief Building Official or his or her authorized representative. C. The soil engineer's area of responsibility shall include, but need not be limited to, the professional inspection and approval concerning this preparation of ground to receive fills, testing for required compaction, stability of all finish slopes, design of buttress fills, subdrain installation and incorporation of data supplied by the engineering geologist. D. The engineering geologist's area of responsibility shall include, but need not be limited to, professional inspection and written approval of the adequacy of natural ground for receiving fills, the stability of cut slopes with respect to geological matters, and the need for subdrains or other groundwater drainage devices. He or she shall report his or her finding to the soil engineer and the civil engineer for engineering analysis. E. The Chief Building Official may inspect the project at the various stages of work requiring approval and at any intervals necessary to determine that adequate control is being exercised by the professional consultants. F. When preliminary soil engineering reports are not required by the Chief Building Official, the Chief Building Official may require inspection and testing by an approved testing agency. The testing agency's responsibility shall include, but need not be limited to, approval of cleared areas and benches to receive fill, and the compaction of fills. G. The Chief Building Official shall not issue any grading permit, waiver, or exemption pursuant to this chapter unless he or she finds that the work authorized by the grading permit, waiver or exemption complies with applicable water quality requirements.

(Ord. No. 03-22, § 1, 6-24-03)