Sec. 6-10-215. - Design-build and progressive design-build procurement processes.
Design-build projects may be procured pursuant to Public Contract Code Section 22160 et seq., as described in Subsection A. Progressive design-build projects may be procured pursuant to Public Contract Code Section 21185 et seq., as described in Subsection B. This Section 6-10-215 is intended to reflect the respective design-build and progressive design-build procurement processes in Public Contract Code Section 22160 et seq. and Public Contract Code Section 22185 et seq. to the extent this section is inconsistent with such provisions, the applicable Public Contract Code provisions shall prevail. A. Procurement of design-build projects. 1. Scope of eligible projects. This subsection authorizes the award of design-build contracts in excess of $1,000,000.00 for: (a) the construction of a building or buildings and improvements directly related to the construction of a building or building, county sanitation wastewater treatment facilities, and park and recreational facilities, and (b) projects that are necessary in order to comply with construction-related accessibility standards, as defined in Section 65946 of the Government Code. This subsection does not authorize the award of design-build contracts for the construction of other infrastructure, including, but not limited to, streets and highways, public rail transit, or water resources facilities and infrastructure, except where expressly authorized by the California Department of Transportation pursuant to Subdivision (h) of Public Contract Code Section 22161. This subsection does not authorize design-build-operate projects, but design-build projects may include operations during a short-term training or transition period. 2. Award of eligible projects. Eligible design-build projects may be awarded to either the lowest bid or best value as selected by the City. Eligible design-build projects shall be awarded based on a conflict-of-interest policy regarding the ability of a person or entity that performs services for the City relating to the solicitation of a design-build project, to submit a proposal as a design-build entity, or to join a design-build team. 3. Procurement method. The following procedure applies to design-build projects procured pursuant to this subsection: a. The City shall prepare a set of documents setting forth the scope and estimated price of the project, which may include, but need not be limited to the size, type, and desired design character of the project, performance specifications covering the quality of materials, equipment, workmanship, preliminary plans or building layouts, or any other information deemed necessary by the Director of Public Works or designee. b. The City shall issue a request for qualifications (RFQ) in order to prequalify or short-list the design-build entities whose proposals shall be evaluated for final selection. The RFQ shall include the following: i. The basic scope and needs of the design-build project; ii. The expected cost range; iii. The methodology that will be used to evaluate proposals; iv. Significant factors that the City reasonably expects to consider in evaluating qualifications, including technical design and construction expertise, acceptable safety record, and all other nonprice-related factors; v. The procedure for final selection of the design-build entity; vi. The City's standard template request for statements of qualifications prepared by the City in consultation with the construction industry, the building trades and surety industry, and other local agencies interested in using the design-build process under this subsection. The standard template shall require, at a minimum, all information required by Paragraph (3) of Subdivision (b) of Public Contract Code Section 22164, and shall be certified under penalty of perjury by the design-build entity and its general partners or joint venture members; vii. Unless exempted due to an existing project labor agreement pursuant to Paragraph 2 of Subdivision (c) of Public Contract Code Section 22164, an enforceable commitment executed by the design-build entity to the City that the design-build entity and its subcontractors at every tier will use a skilled and trained workforce to perform all work on the project or contract that falls within an apprenticeable occupation in the building and construction trades, in accordance with Chapter 2.9 (commencing with Section 2600) of Part 1 of the Public Contract Code; viii. Any required subcontractors to be included in the responding design-build entity's statement of qualifications, which subcontractors shall be entitled to the protections of Chapter 4 of Part 1 of the Public Contract Code; ix. Any information deemed necessary by the City in order to adequately describe its needs or to inform interested parties of the contracting opportunity; and x. Any other information deemed necessary by the City for the design-build project. c. The City shall issue a Request for Proposals (RFP) that invites the prequalified or short-listed entities to submit competitive sealed proposals in the manner indicated in the RFP. The RFP shall include: i. Identification of the basic scope and needs of the design-build project; ii. The estimated cost of the project; iii. The methodology that will be used by the City to evaluate proposals, which shall include the price (or stipulated sum if specified), technical design and construction expertise, and life cycle costs over 15 or more years; iv. Whether the contract will be awarded on the basis of low bid or best value; v. Significant factors that the City reasonably expects to consider in evaluating proposals, including, but not limited to, cost or price and all nonprice-related factors; vi. The relative importance or the weight assigned to each of the factors identified in the request for proposals; vii. Any information deemed necessary by the City in order to adequately describe its needs or to inform interested parties of the contracting opportunity; and viii. Any other information deemed necessary by the City for the design-build project. d. Low bid awards. For those projects utilizing low bid as the final selection method, the competitive bidding process shall result in lump-sum bids by the prequalified or short-listed design-build entities, and awards shall be made to the design-build entity that is the lowest responsible bidder. e. Best value awards. The selection process for best value awards shall be as follows: i. Competitive proposals shall be evaluated only by the criteria in the RFP. ii. The City may reserve the right in the RFP, to request proposal revisions and hold discussions and negotiations with responsive proposers. RFPs including this reservation shall include a procedure to be observed by the parties to ensure discussions and negotiations are conducted in good faith. iii. When evaluations are complete, the responsive proposers shall be ranked based on a determination of value, provided that no more than three proposers are required to be ranked. iv. The award of the contract shall be made to the responsible design-build entity whose proposal is determined by the City to have offered the best value to the public. v. The City shall publicly announce its award, identifying the design-build entity to which the award is made, along with a statement regarding the basis of the award. f. Subcontractors. Following the award of a design-build project pursuant to this Subsection, the design-build entity shall comply with Public Contract Code Section 22166 as the same may be amended from time to time for all construction subcontracts with a value exceeding one-half of one percent of the contract price allocable to construction work. g. Sunset date. The provisions of this Subsection A. shall sunset and shall be automatically repealed on the date provided in Chapter 4 of Part 3 of Division 2 of the Public Contract Code, which is January 1, 2031, unless amended by successor legislation. B. Procurement of progressive design-build projects. 1. Scope of eligible projects. This subsection authorizes the award of up to 10 progressive design-build projects in excess of $5,000,000.00 for each project. 2. Award of eligible projects. Eligible design-build projects awarded pursuant to this subsection shall be awarded based on a conflict of interest policy developed by the City regarding the ability of a person or entity that performs services for the City relating to the solicitation of a progressive design-build project, to submit a proposal as a progressive design-build entity, or to join a design-build team. 3. Procurement method. The following procedure applies to design-build projects procured pursuant to this subsection: a. The City shall issue a request for qualifications (RFQ) in order to select a design-build entity to execute the project. The RFQ shall include the following: i. The size, type, and desired design of the project; ii. The expected cost range; iii. The methodology that will be used to evaluate the design-build entity's qualifications, including the relative importance or the weight assigned to each of the factors identified in the RFQ; iv. Significant factors that the City reasonably expects to consider in evaluating qualifications, including technical design and construction expertise, acceptable safety record, and all other non-price-related factors; v. The procedure for final selection of the design-build entity; vi. The City's standard request for statements of qualifications prepared by the City in consultation with the construction industry, the building trades and surety industry, and other local agencies interested in using the design-build process under this subsection. The standard template shall require, at a minimum, all information required by Paragraph (4) of Subdivision (1) of Public Contract Code Section 22185.3 and shall be certified under penalty of perjury by the design-build entity and its general partners or joint venture members; vii. Unless exempted due to an existing project labor agreement pursuant to Paragraph 2 of Subdivision (b) of Public Contract Code Section 22185.3, an enforceable commitment executed by the design-build entity to the City that the design-build entity and its subcontractors at every tier will use a skilled and trained workforce to perform all work on the project or contract that falls within an apprenticeable occupation in the building and construction trades, in accordance with Chapter 2.9 (commencing with Section 2600) of Part 1 of the Public Contract Code; viii. Any required subcontractors to be included in the responding design-build entity's statement of qualifications, which subcontractors shall be entitled to the protections of Chapter 4 of Part 1 of the Public Contract Code; ix. Any information deemed necessary by the City in order to adequately describe its needs or to inform interested parties of the contracting opportunity; and x. Any other information deemed necessary by the City for the progressive design-build project. b. At the close of the solicitation period, the City shall review the submissions. The City may evaluate submissions based solely upon the information provided in each design-build entity's statement of qualifications. The City may also interview some or all of the design-build entities to further evaluate their qualifications for the progressive design-build project. c. Upon issuance of a contract award, the City shall publicly announce its award, identifying the design-build entity to which the award is made, along with a statement regarding the basis of the award. 4. Determination of maximum price, remaining project work. a. After selecting a design-build entity based upon qualifications, the City may enter into a contract and direct the design-build entity to begin design and preconstruction activities sufficient to establish a guaranteed maximum price for the project. Upon agreement of the guaranteed maximum price for the project, the City, at its sole and absolute discretion, may amend its contract with the design-build entity to contract for the remaining design, preconstruction, and construction activities sufficient to complete and close out the project, consistent with the guaranteed maximum price. b. In the event that there are unforeseen site conditions, the City may amend its contract with the design-build entity accordingly and consistent with the guaranteed maximum price, to enable the entity to complete the remaining design, preconstruction, and construction activities sufficient to complete and close out the project. c. If the cost for completing all remaining design, preconstruction, and construction activities sufficient to complete and close out the project exceeds the guaranteed maximum price, the costs exceeding the guaranteed maximum price shall be the responsibility of the design-build entity. If the cost for these activities is less than the guaranteed maximum price, the design-build entity shall not be entitled to the difference between the cost and the guaranteed maximum price unless there is a prior written agreement concerning the sharing of these funds. The costs subject to the requirements in this Paragraph 4 shall include the design-build entity's direct costs, general conditions, overhead, and fees. d. If the City and the design-build entity do not reach agreement on a guaranteed maximum price, or the City otherwise elects not to amend the design-build entity's contract to complete the remaining work, the City may solicit proposals to complete the project from firms that submitted statements of qualifications pursuant to the procedure set forth in Paragraph 3. The City may also, upon written determination that it is in the best interest of the City, to do so, formally solicit proposals from other design-build entities, and contract award shall be made on a best value basis. e. The design professionals responsible for performing design services on behalf of a design-build entity that has been replaced pursuant to the procedure in this Paragraph 4 shall have sole liability for their design errors and omissions, provided the City elects to use their complete and stamped designs with subsequent design-build entities, or licensed contractors. 5. Subcontractors. For design-build contracts with a contract value of greater than or equal to $10,000,000.00, subcontracts not included in the successful design-build entity's statement of qualifications in response to the RFQ and exceeding one-half of one percent of the contract price allocable to construction work shall be awarded in compliance with Public Contract Code Section 22185.6 as the same may be amended from time to time. 6. Reporting. All design-build projects awarded pursuant to this Subsection B shall be included on the City's report to the State of California pursuant to Public Contract Code Section 22185.8 as the same may be amended from time to time. C. Design-build contract provisions. The contract with the selected design-build entity for both design-build projects and progressive design-build projects shall be in a form approved by the City, subject to the following: a. The contract shall require payment and performance bonds on standard forms developed by the City for the project in the amount required by the City, and issued by a California admitted surety. The amount of the payment bond shall not be less than the amount of the performance bond. b. The contract shall require the provision by the design-build entity of errors and omissions insurance coverage for the design elements of the project. c. Retention proceeds withheld by the City shall not exceed five percent if performance and payment bonds are required. Work performed to establish the guaranteed maximum price (where applicable) shall not be subject to retention. d. In a contract between the design-build entity and a subcontractor, and in a contract between a subcontractor and any subcontractor thereunder, the percentage of the retention proceeds withheld shall not exceed the percentage specified in the contract between the City and the design-build entity. If the design-build entity provides written notice to any subcontractor that is not a member of the design-build entity, before or at the time the bid is requested, that a bond may be required, and the subcontractor subsequently is unable or refuses to furnish a bond to the design-build entity, then the design-build entity may withhold retention proceeds in excess of the percentage specified in the contract between the City and the design-build entity from any payment made by the design-build entity to the subcontractor. D. Sunset date. The provisions of this Subsection B. shall sunset and shall be automatically repealed on the date provided in Chapter 4.7 of Part 3 of Division 2 of the Public Contract Code, which is January 1, 2030, unless amended by successor legislation.
(Ord. No. 25-07, § 5, 4-8-25)
Ask a question about Irvine law
Corpus searches the Irvine sections it holds and shows the ones that match, with their citations. Free, no sign-in.