For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 9-33-8 — Special development requirements

Irvine Municipal Code (Supp. No. 20: codified through Ordinance No. 26-05, adopted February 10, 2026) · Irvine Zoning Ordinance § 9-33-8

Corpus is an independent public-information project, not the official City of Irvine website. Stable reference: corpuslaw.us/code/53cd2d5d-46a3-4b65-98c5-473cc40fc09f

Sec. 9-33-8. - Special development requirements.

A. Regardless of the provisions of this text, no construction shall be allowed within the boundaries of Irvine Spectrum Center except that which complies with all provisions of the applicable building codes and the various mechanical codes related thereto. B. Any land use proposal not specifically covered by this plan and its text shall be subject to the regulations of the City of Irvine Zoning Code. Whenever the regulations contained in this text conflict with the regulations of the City of Irvine zoning ordinance, the regulations for Irvine Spectrum Center shall take precedence. C. Within Irvine Spectrum Center, the continued use of the land for agricultural purposes with uses, structures and appurtenances accessory thereto shall be permitted subject to the provisions of the agricultural land use category of the City of Irvine zoning ordinance. D. Grading will be permitted within Irvine Spectrum Center outside of an area of immediate development upon the securing of a grading permit. Required grading information shall be submitted to the Director of Community Development for his or her approval. At the time of actual development of any portion of Planning Area 33, a complete report of a preliminary engineering geology and soil engineering investigation showing evidence for a safe and stable development is to be submitted with the tentative tract map. The recommendations by the engineering geologist and soil engineer shall be incorporated into the grading plan design prior to grading permit approval. The soil engineer and engineering geologist must certify the stability of the site prior to issuance of building permits. E. The height of all buildings and structures shall not exceed FAA criteria and shall be reviewed and approved at the time of Master Plan review. F. Water service and sewage disposal facilities within Irvine Spectrum Center shall be furnished by the Irvine Ranch Water District. G. The property lies within the boundaries of the Orange County Master Plan of drainage for the East Irvine area. The plan, when completed, will be administered for the City of Irvine by the Orange County Flood Control District. Developers of the land will be required by the City to participate in this Master Plan in a manner meeting the approval of the Chief Engineer of the Orange County Flood Control District. Said participation may include the construction of Master Plan facilities or the dedication of right-of-way. H. Detailing of the location of the 60 CNEL line relative to Phase II development shall be made at Phase II conceptual design review hearings. I. For the conceptual design review hearing, the EIR information will be updated to the level of specificity which is equivalent to that level of information which is generally required for that process. J. Prior to the approval of the conceptual urban design plan, the applicant shall submit data from a qualified archaeologist/paleontologist determining the significance of the sites and making recommendations for salvage and/or preservation. The data submitted shall also designate which sites will be destroyed by the project as proposed, which sites can be built upon and still be preserved, and which sites are significant enough to salvage. The archaeologist shall be notified of and review the test borings done by the soils engineer. K. Prior to the submission of the conceptual urban design plan, a plan of drainage shall be prepared in conjunction with that required for the IIC-East which meets the approval of both the Orange County Flood Control District and the City of Irvine. L. The applicant shall pay a deposit commensurate with that which is charged for a zone change for the processing of the conceptual urban design plan. M. Reserved. N. The interiors of nonresidential structures shall be sound-attenuated from exterior noise to meet the following intrusive interior noise criteria: Use | Leq (12) Private office | 40 to 50 General office | 45 to 55 Bank, retail store, restaurants | 50 to 55 Shopping mall | 50 to 60 Assembly, testing | 65 to 75 O. The interiors of motel and hotel structures shall be attenuated from exterior noise in conformance with Title 25 of the California Administrative Code. P. Prior to the issuance of building permits, a noise study demonstrating the Leq (12) based on the measured noise level not exceeded by 95 percent of the field mirror practice landing operations over the site and the effectiveness of the proposed construction techniques for meeting the criteria established in Subsection N shall be submitted to the Director of Community Development. Q. The area adjacent to the freeway mainline right-of-way lines, excluding on- and off-ramps to SR-133, lines shall be landscaped to a depth of approximately 30 feet. The exact depth shall be determined during Master Plan review. Landscaping for these areas shall consist of an effective combination of trees, ground cover and shrubbery, and may include such items as sidewalks, access driveways, allowed signs, flagpoles, fountains, lights and other similar appurtenances. R. During development case review for the regional shopping center, the applicant shall indicate an area within the center for use by the Irvine Public Safety Department. Prior to approval of final site plans, the applicant and the City shall come to an agreement on how the City is to obtain this space. The plans and agreement shall be reviewed by the Director of Public Safety to ensure they conform to the Department's requirements. S. Prior to or in conjunction with the submittal of the first tentative map for Irvine Spectrum Center, the applicant and the City shall come to an agreement on the location and size of a maintenance station to service Irvine Spectrum Center. This agreement shall be reviewed and approved by the Director of Public Works. T. Prior to the approval of the first tentative map for Irvine Spectrum Center Phase II, the applicant and the City shall determine the alignment of the Transportation Corridor and identify locations of transit stops. The alignment and transit stop locations shall be reviewed by the Planning Commission and approved by the Director of Public Works prior to this determination. The alignment shall appear as an easement/reservation for future dedication on all subsequent tentative maps where applicable. U. Prior to or in conjunction with the submittal of the first tentative map for Irvine Spectrum Center, the applicant shall submit a Master Plan of bicycle trails to be reviewed and approved by the Planning Commission. The Master Plan shall show the regional level and "backbone" system. As part of this system, an alignment for a Class I bicycle trail through Irvine Spectrum Center shall be shown to ensure consistency with the City's adopted General Plan unless the General Plan has been amended so that the trail classification has been changed. In any event, the Master Plan shall be consistent with the General Plan in effect at the time the Master Plan is submitted. Internal or local trail systems shall be approved in conjunction with each site plan and corresponding tentative map, where such a map is required. V. Prior to or in conjunction with the submittal of the first tentative map for Irvine Spectrum Center, the applicant shall submit a plan showing riding and hiking trail connections, which shall be consistent with the then-adopted General Plan for such trails. W. Prior to or in conjunction with the submittal of the first tentative map for Irvine Spectrum Center, the applicant shall submit a Master Plan showing potential bus stops and bus shelters for review and approval by the Planning Commission. X. Prior to the submittal of the first tentative map for Irvine Spectrum Center, the applicant shall submit an analysis of circulation improvements which will be required as a result of development. This analysis shall address phasing of necessary major improvements. It shall be reviewed by the Planning Commission prior to approval by the City Council. Each time a tentative map is submitted for approval, the analysis shall be updated and then used to identify appropriate conditions of approval. A report on the status of circulation improvements shall be prepared on an annual basis from the date of approval for the first tentative map in Irvine Spectrum Center and submitted for the City Council's review. Y. At the time of filing parcel maps abutting the freeway near the proposed site, the City may require the developer to landscape the adjoining freeway if the State concurs with this requirement and if the State agrees to maintain the landscaping. Z. Prior to the approval of any tentative map for Irvine Spectrum Center, the feasibility of the development agreement shall be investigated to ensure projected revenues to the City and reduce uncertainties related to the development from both the viewpoint of the developer and the City. The analysis and recommendations shall be reviewed by the Planning Commission and accepted by the City Council prior to the approval of any tentative map for Irvine Spectrum Center.

(Code 1976, § V.E-833.7; Ord. No. 92-3, 4-14-92; Ord. No. 92-21, 11-24-92; Ord. No. 95-3, § 3G, 4-25-95; Ord. No. 95-4, 5-9-95; Ord. No. 95-22, § 3, 11-28-95; Ord. No. 99-03, § 3, 2-9-99; Ord. No. 00-02, § 4, 2-8-00; Ord. No. 04-03, § 3, 2-24-04; Ord. No. 09-02, § 3, 3-24-09; Ord. No. 23-21, Exh. A, 10-24-23)

Ask a question about Irvine law

Corpus searches the Irvine sections it holds and shows the ones that match, with their citations. Free, no sign-in.