For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 9-36-11 — High-traffic-generating commercial uses

Irvine Municipal Code (Supp. No. 20: codified through Ordinance No. 26-05, adopted February 10, 2026) · Irvine Zoning Ordinance § 9-36-11

Corpus is an independent public-information project, not the official City of Irvine website. Stable reference: corpuslaw.us/code/78258f1e-a76c-48f6-b3ff-c6b1c23e4804

Sec. 9-36-11. - High-traffic-generating commercial uses.

A. Intent of this section. It is the intent and purpose of this section to assure that certain land uses which generate high levels of traffic are prevented from exceeding the levels of traffic originally analyzed in the environmental documents for Planning Area 36. These specific land uses are identified with a footnote (T) in the City-wide land use matrix (see Section 3-3-1). B. In projects which include uses identified with a footnote (T) in the land use matrix (Section 3-3-1), a conditional use permit shall be required. In addition to the required materials listed in Section 2-9-3, the conditional use permit application shall include a traffic analysis prepared under the direction of the Director of Community Development. Assigned general land use category development intensity value rates shall be utilized for determining whether a.m./p.m. development intensity value allocations in the database are exceeded. Traffic study requirements may be waived if the project does not meet the minimum traffic generation threshold specified in the traffic study guidelines. C. Prior to approval of an extended stay hotel project, the applicant shall submit a vehicle trip generation rate verification study. This study shall demonstrate that the individual project's trip generation rates are consistent with the IBC extended stay hotel development intensity value rates. The Planning Commission shall review and render a decision on whether the individual project's vehicle trip rates are consistent with the IBC extended stay hotel development intensity value rate prior to planning commission review of the project. D. Findings. In addition to the findings listed in Section 2-9-7, the following findings shall be made in order to approve a conditional use permit for high-traffic-generating commercial uses: 1. Approval of the project will not result in exceeding the a.m. and p.m. development intensity value allocations established for the project site in the IBC land use and development intensity value database, subject to the findings of the traffic analysis. 2. Approval of the project will not jeopardize the ability of the City of Irvine to qualify for funding sources such as, but not limited to, the Orange County Congestion Management Program (CMP) or Measure M.

(Ord. No. 10-07, § 9(Exh. B), 7-27-10; Ord. No. 26-01, Exh. A, 2-10-26)

Ask a question about Irvine law

Corpus searches the Irvine sections it holds and shows the ones that match, with their citations. Free, no sign-in.