For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 3.65.140 — Fees for implementing California Environmental Quality Act (CEQA)

Municipal Code of the City of Jurupa Valley, California (Codified through Ordinance No. 2026-12, enacted October 1, 2026 (Supp. No. 28)) · Jurupa Valley Municipal Code § 3.65.140

Corpus is an independent public-information project, not the official City of Jurupa Valley website. Stable reference: corpuslaw.us/code/d810c345-a3b6-4267-8e99-949819a45621

Sec. 3.65.140. - Fees for implementing California Environmental Quality Act (CEQA).

The fees and EIR deposits for environmental review pursuant to the Rules for Jurupa Valley Implementing the California Environmental Quality Act for the following shall be as follows or until modified by resolution by the City Council: A. | No fee shall be required for the following projects: (1) | Projects which are categorically exempt from environmental review by the State Guidelines of the Rules for Riverside County Implementing the California Environmental Quality Act (CEQA), unless an initial study is conducted to determine if the project is exempt. (2) | County projects when the fee will be paid into the same fund into which it is deposited. (3) | Requests to improve and accept a road into the county maintained road system. (4) | Preparation of an initial study on an application to change the zoning designation on a parcel when the application is require to be filed as a condition of approval on a previously approved application. B. | The fees required for requests to conduct initial studies relating to the following applications shall be paid to the Planning Department as follows: | Fee Amount (1) | Applications for Grading Permits | Deposit-based fee: (a) General Fund (i) Planning Department | $900 plus per acre fee (to a maximum of $2,729) | $6 (ii) Public Works Department—Comprehensive Transportation Plan | $51 (2) | Applications for Commercial Wind Energy Conservation System Permits (Commercial WECS Permits) | Deposit-based fee: (a) General Fund (i) Planning Department | $471 plus per gross acre fee | $6 to a maximum | $2,201 plus per gross megawatt (MW) fee applied for | $307 (ii) Public Works Department—Comprehensive Transportation Plan | $36 plus per gross megawatt (MW) fee applied for | $22 (3) | All Other Applications | Deposit-based fee: (a) General Fund (i) Planning Department | $414 plus fee per gross acre | $6 to a maximum | $2,416 (ii) Public Works Department—Comprehensive Transportation Plan | $48 Whenever two or more applications are filed concurrently by the same applicant for the same property, only one fee for the preparation of an initial study shall be required. C. | The deposits required for the preparation of the draft EIR shall be paid to the Planning Department as follows: (1) | If the project sponsor prepares the draft EIR: | Deposit-based fee: (a) General Fund (i) Planning Department | $7,187 (ii) Environmental Health | $395 (iii) Public Works Department—Comprehensive Transportation Plan | $529 (b) Parks District | $328 (2) | If, pursuant to Section 706 of the Rules for Riverside County Implementing the California Environmental Quality Act, a previously prepared EIR is utilized as the draft EIR: | Deposit-based fee: (a) General Fund (i) Planning Department | $1,126 (ii) Environmental Health | $395 (iii) Public Works Department—Comprehensive Transportation Plan | $87 (b) Parks District | $328 D. | The fees for the preparation of the following environmental reports shall be paid to the Planning Department as follows: (1) | Fault Hazard Report Review (CEQA) | Deposit-based fee: (a) General Fund (i) Planning Department for the first 10 acres | $800 plus per each additional acre fee (two reviews) | $20 to a maximum | $770 (ii) Public Works Department—Comprehensive Transportation Plan for the first 10 acres | $38 plus per each additional acre fee | $2 to a maximum | $53 (2) | Geologic Waiver | Deposit-based fee: (a) General Fund (i) Planning Department | $135 (ii) Public Works Department—Comprehensive Transportation Plan | $5 (3) | Liquefaction Report | Deposit-based fee: (a) General Fund (i) Planning Department (two reviews) | $800 (ii) Public Works Department—Comprehensive Transportation Plan | $38 E. | The fees required for the preparation of the following special studies shall be paid to the Flood Control District as follows: (1) | Flood Control Special Studies | Deposit-based fee: If special hydraulic studies are required (as determined by the Chief Engineer) the review fee shall be based upon the District's actual direct cost plus administrative overhead. Initial deposit shall be required for a minor case, payable at the Flood Control District. | $750 (2) | Flood Control Special Studies | Deposit-based fee: If special hydraulic studies are required (as determined by the Chief Engineer) the review fee shall be based upon the District's actual direct cost plus administrative overhead. Initial deposit shall be required for a major case, payable at the Flood Control District. | $3,000 (3) | Federal Emergency Management Agency (FEMA) studies) (a) Conditional Letter of Map Revision (CLOMR) | Deposit-based fee: Processing fee shall be based upon the District's actual direct cost plus administrative overhead. Initial deposit shall be required, payable at the Flood Control District. | $5,000 (b) CLOMR to LOMR (Letter of Map Revision) Conversion fee shall be paid at the Flood Control District prior to recordation. | $2,582 F. | The fees for the preparation of the following special studies shall be paid to the Public Works Department as follows: (1) | Traffic Study without model (if required) | Deposit-based fee: | $1,252 (2) | Traffic Study with model (if required) | Deposit-based fee: | $1,811

Ask a question about Jurupa Valley law

Corpus searches the Jurupa Valley sections it holds and shows the ones that match, with their citations. Free, no sign-in.