§ 6.65.030 — General requirements for an approval and construction permit

Municipal Code of the City of Jurupa Valley, California (Codified through Ordinance No. 2026-12, enacted October 1, 2026 (Supp. No. 28)) · Jurupa Valley Municipal Code § 6.65.030

Corpus is an independent public-information project, not the official City of Jurupa Valley website. Stable reference: corpuslaw.us/code/6a9fbaee-1068-4f37-b466-fc9119cf231f

Sec. 6.65.030. - General requirements for an approval and construction permit.

A. No person shall erect, construct, rebuild, convert or alter any plumbing system designed for the discharge or disposal of sewage or sewage effluent unless he or she has first obtained a written approval for such purpose from the Director. In designated areas of the city, this approval shall also constitute a construction permit. B. If it is impracticable to connect a plumbing fixture affecting the sanitary drainage system with a street sewer, the sewage effluent must be disposed according to the minimum standards of the most recent edition of the California Plumbing Code and the sewage disposal requirements in the department's manual, as such requirements may be amended from time to time. Setback requirements between subsurface sewage disposal components (including septic tanks, distribution and leaching systems) and any water well shall be as specified in Section 15.20.150. (1) The type of sewage facilities installed shall be determined on the basis of location, soil porosity, site slope and groundwater level, and shall be designed to receive all sanitary sewage from the property. No surface drainage shall be permitted to enter any part of the OWTS. The OWTS, except as otherwise provided, shall consist of a septic tank with effluent discharging by gravity flow into a dispersal system. Under special circumstances (when conventional parameters cannot be met), other disposal methods may be utilized with the approval of the Director. (2) OWTS sizing shall be based on the higher volume estimation as determined by either the number of bedrooms or plumbing fixture unit counts. (3) The location and installation of the sewage facilities and each part thereof shall be such that, with reasonable maintenance, the OWTS will function in a sanitary manner and will not result in contamination, pollution or creation of a nuisance or endanger the safety of any domestic water supply or public health. (4) New OWTS or OWTS subject to major repair shall be designed to prevent solids in excess of one-eighth (⅛) inch in diameter from passing to the dispersal system while under two (2) feet of hydrostatic head. Septic tanks that use National Sanitation Foundation (NSF)/American National Standards Institute (ANSI) Standard 46 certified septic tank filter at the final point of effluent discharge from the OWTS and prior to the dispersal system shall be deemed to meet this requirement. (5) Septic tanks shall have at least two (2) access openings using risers that allow access to the tank interior meeting the following requirements: (a) Each compartment shall have an access opening; (b) Access openings shall be at least twenty (20) inches in diameter; (c) Access openings shall be secured (locked or equivalent) to prevent unauthorized access; and (d) Access openings shall have watertight risers and shall be set at or near finished grade. (6) Dispersal systems shall be sited in soils that are suitable for new and repaired OWTS operation. Where soils consist of greater than ten (10) percent rock fragments (cobbles, stones and gravel), the dispersal system area shall be increased in proportion to the percent of rock fragments to compensate for the lost treatment volume. (7) Conventional OWTS dispersal systems shall have at least five (5) feet of continuous soil below the bottom of the dispersal system and above the seasonal high groundwater level and eight (8) feet of soil to fractured/weathered bedrock at all times. (8) Approval of an OWTS shall require: detailed plan review, pre-site, and construction inspections. C. OWTS installation. (1) The installation shall be performed by a qualified service provider in a manner that is consistent with the approved plan design. (2) In the event that conditions on-site prevent the installation or function of the OWTS as designed, a revised design plan must be submitted to and approved by the department prior to installation. D. Construction inspection. All OWTS shall require a construction inspection and final approval by the department prior to use. E. Any person desiring approval of an OWTS shall submit an application on a form to be provided by the department. Such application shall be accompanied by a fee as required in County Ordinance No. 671. The application shall contain the following information: (1) Name and address of applicant; (2) Location of the proposed installation or reconstruction; (3) A scaled, engineered contoured site development permit describing the proposed construction or alteration in sufficient detail to enable the Director to determine whether the proposed installation or alteration is in compliance with the provisions of this section. All drawings must be made on a scale not less than twenty (20) feet to an inch; (4) Other information as deemed necessary by the Director to adequately determine the suitability of a site for the utilization of an OWTS. This information may consist of, but is not limited to, one or more of the following: (a) A soils percolation report which adequately evaluates soil percolation requirements as prescribed in the department's manual. When a soils percolation test is to be performed, the department is to be notified so that department staff can be made available to observe the testing. (b) A groundwater and/or bedrock evaluation report. To effectively evaluate seasonal groundwater, a minimum of eighty (80) percent of the average annual rainfall shall have fallen based on record of rainfall accumulations from the nearest weather stations. To measure the groundwater level, a groundwater detection boring shall be installed and this detection boring shall be left in place for the department to make determinations of the groundwater levels. The exact specifications for this detection boring shall be as prescribed in the department's manual.

Ask a question about Jurupa Valley law

Corpus searches the Jurupa Valley sections it holds and shows the ones that match, with their citations. Free, no sign-in.