For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 7.35.070 — Payment of fees

Municipal Code of the City of Jurupa Valley, California (Codified through Ordinance No. 2026-12, enacted October 1, 2026 (Supp. No. 28)) · Jurupa Valley Municipal Code § 7.35.070

Corpus is an independent public-information project, not the official City of Jurupa Valley website. Stable reference: corpuslaw.us/code/ce2f6118-eac9-44e2-a483-b5b468d1f05a

Sec. 7.35.070. - Payment of fees.

A. Road improvement fees for areas of benefit shall be paid as follows: (1) Road improvement fees shall be paid to the Public Works Director at the time of issuance of a certificate of occupancy or upon final inspection, whichever occurs first. The fees paid shall be based on the fee schedule in effect on date of payment. (2) In the event a land division was previously conditioned to pay road improvement fees prior to recordation of a final or parcel map, the land divider may submit a written request to defer the payment of fees until issuance of a certificate of occupancy or upon final inspection, whichever occurs first. The fees paid shall be based on the fee schedule in effect on the date of payment and shall be paid to the Public Works Director. (3) The City Council may, at the time of approval of a land division, require land divisions within General Plan Policy Areas to pay road improvement fees to the Public Works Director prior to recordation of a final or parcel map if the City Council finds that: (1) early payment of such fees is necessary to defray the actual or estimated costs for the construction of bridges or major thoroughfares and (2) the existing bridges or major thoroughfares are currently inadequate or non-existent and critical to support the land division. The fees paid shall be based on the fee schedule in effect on the date of payment. (4) For any parcel or lot created prior to the adoption of the resolution establishing the Area of Benefit, road improvement fees shall be paid to the Public Works Director at issuance of a certificate of occupancy or upon final inspection, whichever occurs first, for any new construction on a parcel or lot that creates additional dwelling units or increases the value of nonresidential structures by more than one-half (½) of their current market value, as determined by the Building Official. All fees collected shall be deposited in a separate account designated for each Area of Benefit. Any fees once collected shall not be returned, except as reimbursement for the construction of designated improvements. The fees shall be based upon the fee schedule in effect on the date of payment. B. Nothing in this section is intended to relieve a subdivider or applicant for a building permit from the requirements imposed under other provisions of this or other city ordinances to dedicate and improve roads as a condition of approval of a tentative map or building permit. C. Notwithstanding the provisions of subsection (A) of this section, payment of fees shall not be required for the following: (1) The alteration or enlargement of an existing building or structure, or the erection of one (1) or more buildings or structures accessory thereto, or both, on the same lot or parcel of land; provided, however that the total value as determined by the Building Official of all such alterations, enlargement or construction which is completed within any one-year period shall not exceed one-half (½) of current market value, as determined by the Building Official, of all existing buildings or structures on the lot or parcel of land. (2) The following accessory buildings and structures: private garages, children's playhouses, radio and television receiving antennas, windmills, silos, tank houses, shops or barns, or buildings that are accessory to one (1) family or two (2) family dwellings. (3) Outdoor advertising structures. (4) Wells. D. Notwithstanding the provisions of subsection (A) of this section, payment of fees shall not be required unless the designated major thoroughfare(s) are in addition to, or a reconstruction of, any existing major thoroughfares serving the Area of Benefit at the time of the adoption of the boundaries for the Area of Benefit. E. Notwithstanding the provisions of subsection (A) of this section, payment of fees shall not be required unless the designated bridge is an original bridge serving the Area of Benefit or an addition to any existing bridge facility serving the Area of Benefit at the time of the adoption of the boundaries of the Area of Benefit. Fees imposed by this section shall not be expended to reimburse the cost of existing bridge construction, unless these costs are incurred in connection with the construction of an addition to an existing bridge for which fees may be required.

Ask a question about Jurupa Valley law

Corpus searches the Jurupa Valley sections it holds and shows the ones that match, with their citations. Free, no sign-in.