§ 14.08.070 — Restoration and further repairs
Municipal Code, City of Lake Forest, California (Includes legislation through Ord. No. 388 adopted August 18, 2026) · Lake Forest Municipal Code § 14.08.070
Corpus is an independent public-information project, not the official City of Lake Forest website. Stable reference: corpuslaw.us/code/b97da877-0a25-4216-9a92-966dbd2b8530
§ 14.08.070: Restoration and further repairs.
A. Immediately upon completion of the work authorized by any permit issued pursuant to this chapter, the permittee shall promptly and in a workmanlike manner refill the excavation or remove the obstruction to the satisfaction of the Director. If any permittee fails or refuses to refill any excavation which he or she has made or remove any obstruction which he or she has placed on any highway, the Director may do so and the permittee shall promptly reimburse the City for the costs thereof. B. The following standards and regulations shall apply to resurfacing, repaving, and tunneling or boring operations: 1. Resurfacing After Refilling and Compacting. After completion of the refilling and compacting of the backfill material in the excavation as specified in Section 14.08.110 and the removal of the obstruction, the permittee shall promptly replace, with temporary or permanent patching material, or repair any portion of the highway surface removed or damaged by the excavation, obstruction or construction operations as specified elsewhere herein, to the satisfaction of the Director, or the Director may elect to have this work performed by City forces or contractors, in which case the permittee shall promptly reimburse the City for the costs thereof. 2. Permanent Repaving. Where the pavement (except Portland cement concrete pavement) or surface has been removed, the permittee shall replace it with a standard repair consisting of either five inches of asphaltic concrete or three inches of asphaltic concrete over six inches untreated rock base except that the standard repair shall not be less in total thickness than the adjacent pavement or surfacing and except that road-mixed surfacing may be repaired with three inches of asphaltic concrete in lieu of the standard repair. Asphaltic concrete shall consist of mineral aggregate and liquid asphalt grade SC-6, or grade 200-300 penetration paving asphalt. If asphaltic concrete or Portland cement concrete pavement is removed, it shall first be sawed at the neat lines of the excavation and subsequently replaced with Portland cement concrete. C. Boring. Excavation of pavement or surfacing on an arterial highway (as shown on the Circulation Element of the City's General Plan) and determined by the Director as having been improved with asphaltic concrete or Portland cement concrete pavement, will be permitted only when physical conditions make boring impossible. All boring and placing conduits, casings and pipelines shall be done in such a manner that the existing driving lanes will not be disturbed. If a casing is installed to receive the conduit or pipeline, all voids between the casing and conduit shall be filled with grout or sand. D. Replacing Entire Driving Lane. If the surfacing or pavement within the driving lanes of an arterial highway (as shown on the Circulation Element of the City's General Plan) and determined by the Director as having been improved with asphaltic concrete or Portland cement concrete is removed or damaged by parallel construction operations, the existing surfacing or pavement of the width of the driving lane for the length of the damaged surfacing shall be removed and replaced except that such a removal and replacement shall in no case be less than 100 feet in length. All materials and construction operations shall conform to the applicable provisions of the City of Lake Forest Standard Specifications, as set forth in Section 14.05.010.
( Ord. 249 § 14, 2013 )
Ask a question about Lake Forest law
Corpus searches the Lake Forest sections it holds and shows the ones that match, with their citations. Free, no sign-in.