§ 8.30.162: Grading requirements.

A. It shall be the responsibility of the civil engineer, architect, or other qualified individual who prepares the grading plan approved by the City Engineer to incorporate all recommendations from the soil engineering and engineering geology reports into the grading plan. The civil engineer shall also be responsible for the professional inspection and approval of the grading within the civil engineer's area of technical specialty. This responsibility shall include, but need not be limited to, inspection and approval as to the establishment of line, grade, and drainage of the development area. The project civil engineer and/or general contractor shall act as the coordinating agent in the event the need arises for liaison between the project professional grading contractor, and the City Engineer and/or Building Official, the civil engineer or other qualified person who prepares and signs the grading plan shall also be responsible for the preparation of revised plans, erosion control plans, and the submission of as-graded grading plans when required by the City Engineer upon completion of the work. B. Soil engineering and engineering geology reports shall be required as specified in Section 8.30.058, Soil engineering and engineering geology reports, of this Grading Code. During grading, all necessary reports, compaction data, soil engineering, and engineering geology recommendations shall be submitted to the owner by the soil engineer and engineering geologist. The owner shall submit copies of the report to the civil engineer and two copies of all reports to the City Engineer. C. The soil engineer's area of responsibility shall include, but need not be limited to, the professional inspection and approval concerning the preparation of ground to receive fills, testing for required compaction, stability of all finish slopes, design of buttress fills, subdrain installation, and incorporation of data supplied by the engineering geologist. D. The engineering geologist's area of responsibility shall include, but need not be limited to, professional inspection and written approval of the adequacy of natural ground for receiving fills, the stability of cut slopes with respect to geological matters, and the need for subdrains or other groundwater drainage devices. The engineering geologist shall report his/her finding to the soil engineer and the civil engineer for engineering analysis. E. The City Engineer and/or Building Official may expeditiously inspect the project at the various stages of work requiring approval and at any more frequent intervals necessary to determine that adequate control is being exercised by the professional consultants. F. When preliminary soil engineering reports are not required by the City Engineer, he/she may require inspection and testing by an approved testing agency. The testing agency's responsibility shall include, but need not be limited to, approval of cleared areas and benches to receive fill, and the compaction of fills. G. The City Engineer shall not issue any grading permit, waiver, or exemption pursuant to this chapter unless the City Engineer finds that the work authorized by the grading permit, waiver or exemption complies with applicable water quality requirements.

( Ord. 107 § 1, 1999 ; Ord. 140 § 2(10), 2003 ; Ord. 246 § 30, 2013 )