§ 9.150.055 — Performance standards, SG site permits

Municipal Code, City of Lake Forest, California (Includes legislation through Ord. No. 388 adopted August 18, 2026) · Lake Forest Municipal Code § 9.150.055

Corpus is an independent public-information project, not the official City of Lake Forest website. Stable reference: corpuslaw.us/code/b9a1660e-6313-4302-8a1f-6e6aa0e48a67

§ 9.150.055: Performance standards, SG site permits.

The establishment, operation and maintenance of the uses permitted by Section 9.150.040 of this chapter shall be in compliance with the following standards unless otherwise provided by an SG site permit approved by the City Council. A. Dust Control. Roads, driveways and parking areas on the site shall be maintained so as to control dust. B. Setbacks. Structures and accessory use setbacks per Sections 9.144.030, 9.144.040, 9.144.080, and 9.150.205. C. Screening. Extracting and processing operations shall be screened in such a manner that they are not readily visible from any public street. Screening shall be set back at least 20 feet from any intersection of driveways, streets or sidewalks. D. Depth. In no event shall excavation in any pit-type of mining operation be permitted in excess of 150 feet in depth as measured from existing grade. For purposes of this subsection only, a "pit-type" of mining operation shall mean a man-made hole, trench, ditch, or similar depression in the surface made for the purpose of extracting sand, gravel, rock, aggregate, clay, or similar materials and which does not drain. An "excavation" is similar except that the excavation may be made to an ultimate depth of an approved grade for a particular site. E. Drainage and Erosion Control. Surface drainage shall be controlled to prevent the addition of silt or loose material above that naturally occurring in any existing drainage course or encroaching upon adjoining property and improvements. All provisions to control watercourses shall be designed to prevent overflow or diversion of water away from the natural point of discharge. Adequate provisions for conveyance of water across and from the site and for long-term retention of water shall be accomplished in a manner so as to minimize potential damages from landslide and erosion. F. Signs per Chapter 9.164 of this title. G. Reclamation Schedule. Except as provided in this section, reclamation of each area shall commence as soon as excavation operations or other SG related operations have been completed within an area, and continue in a diligent manner prior to or concurrently with the extension of excavation operations to a new area. H. Removal of Buildings and Equipment. Buildings and equipment used in surface mining and quarrying operations shall be removed within six months of the termination of surface mining and quarrying operations.

( Ord. 176 § 1, 2007 )