§ 15.46.040 — Permit Review and Inspection Requirements

Lancaster Municipal Code, City of Lancaster, California (Supp. No. 4-26: codified through Ordinance No. 1154, enacted September 8, 2026) · Lancaster Municipal Code § 15.46.040

Corpus is an independent public-information project, not the official City of Lancaster website. Stable reference: corpuslaw.us/code/ff37f11a-fe11-4b52-81b1-d82a4be0985d

15.46.040 - Permit Review and Inspection Requirements.

A. Prior to submitting an application for processing, the applicant shall verify that the installation of an electric vehicle charging station will not have specific, adverse impacts to public health and safety and building occupants. Verification by the applicant includes, but is not limited to, electrical system capacity and loads; electrical system wiring, bonding, and overcurrent protection; building infrastructure affected by charging station equipment and associated conduits; and areas of charging station equipment and vehicle parking. Upon filing the application, the applicant shall pay a permit application fee as established by a resolution adopted by the city council, as amended from time to time. B. A permit application that satisfies the information requirements in the City's adopted checklist shall be deemed complete and be promptly processed. Upon confirmation by the building official that the permit application and supporting documents meet the requirements of the city adopted checklist, and is consistent with all applicable laws and health and safety standards, the building official shall, consistent with Government Code Section 65850.7, approve the application and issue all necessary permits. Such approval does not authorize an applicant to energize or utilize the electric vehicle charging station until final inspection and approval of the installation of the station have been granted by the city. If the building official determines that the permit application is incomplete, he or she shall issue a written correction notice to the applicant, detailing all deficiencies in the application and any additional information required to be eligible for expedited permit issuance. C. If the building official makes a finding based on substantial evidence that the electric vehicle charging station could have a specific adverse impact upon the public health or safety, as defined in this chapter, the city may require the applicant to apply for a use permit. D. Consistent with Government Code Section 65850.7, the building official shall allow for electronic submittal of permit applications covered by this section and associated supporting documentation. In accepting such permit applications, the building official shall also accept electronic signatures on all forms, applications, and other documentation in lieu of a wet signature by any applicant.

(Ord. No. 1139, § 1, 10-28-2025)

Ask a question about Lancaster law

Corpus searches the Lancaster sections it holds and shows the ones that match, with their citations. Free, no sign-in.