16.48.010 - Lot line adjustments.

A. General. A lot line adjustment is a shift or rotation of an existing lot line between two or more parcels, where land taken from one parcel is added to an adjacent parcel and where a greater number of parcels than originally existed is not created. B. Eligibility. The director may approve the lot line adjustment where it is determined that the proposed adjustment: 1. Does not create additional lots; 2. Does not impair any existing access, easement, lot configuration or orientation or utilities to lot lines proposed; and 3. The parcels affected by the lot line adjustment conform to this title and Title 17. C. Procedures. 1. The subdivider may submit the completed application for lot line adjustment to the department. The applicant shall submit the following information to the director: a. Provide a copy of the assessor's map for all properties involved; b. Provide a copy of current grant deeds for all properties involved; c. Provide a preliminary title report for the notification of lenders; d. Provide copies of the site plan showing the original lot lines, the proposed lot lines, and any existing improvements; e. Exhibits of legal descriptions for the original configuration and the proposed configuration are to be submitted to the city engineer for processing after the director's approval. The legal descriptions shall be in a form acceptable to the city engineer; f. If the city engineer determines that a declaration of subordination is needed, the applicant or engineer will be notified. This declaration would be needed in order to properly notify the lender of the lot line adjustment and the applicant will be charged an additional fee; g. If the lot line involves two separate property owners and/or a transfer of easements, the applicant shall be required to open escrow with an escrow company. 2. The director shall consider the request and determine if the created lots conform to Title 17 of this code. The director shall approve or deny the application for the lot line adjustment within thirty (30) days. If the application is denied, the director shall state the reasons for denial in the notification to the applicant. 3. The director shall forward the lot line adjustment to the city engineer for recordation of a certificate of compliance or a conditional certificate of compliance. 4. The city engineer shall file a certificate of compliance for the lot line adjustment with the county recorder for recordation. D. Appeals. The decision of the director or the city engineer regarding lot line adjustments may be appealed as provided in Section 16.04.070.

(Ord. 661 § 1 (1200.100—1200.140), 1994)

Ask a question about Lancaster law

Corpus searches the Lancaster sections it holds and shows the ones that match, with their citations. Free, no sign-in.