For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 15.24.090 — Pipe—Laying method

Long Beach Municipal Code (Supp. No. 53, Update 1: codified through Ordinance No. ORD-26-0027, enacted October 13, 2026) · Long Beach Municipal Code § 15.24.090

Corpus is an independent public-information project, not the official City of Long Beach website. Stable reference: corpuslaw.us/code/b8ee28d8-2b59-42c1-b82d-a8d547d6bf6b

15.24.090 - Pipe—Laying method.

All pipe shall be laid upgrade on an unyielding foundation, true to line and grade and with a uniform bearing under the full length of the barrel of the pipe. Bell and spigot pipe shall be laid with sockets upgrade. Suitable excavations shall be made to receive the bells or collars of the pipe. All adjustments to bring the pipe to line and grade shall be made by scraping away or filling in under the body of the pipe, and not by wedging or blocking.

(Prior code § 7570.80)

Ask a question about Long Beach law

Corpus searches the Long Beach sections it holds and shows the ones that match, with their citations. Free, no sign-in.