For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 16.08.760 — Construction permit—Required

Long Beach Municipal Code (Supp. No. 53, Update 1: codified through Ordinance No. ORD-26-0027, enacted October 13, 2026) · Long Beach Municipal Code § 16.08.760

Corpus is an independent public-information project, not the official City of Long Beach website. Stable reference: corpuslaw.us/code/3b2aa2a4-32ed-4faf-a8ee-781cd4103eeb

16.08.760 - Construction permit—Required.

A. No person shall construct, reconstruct or maintain any wharf, pier, landing, float, bulkhead, seawall or other structure of any kind whatsoever within the limits of the Long Beach Marina area therein, for the benefit or use of any private person without first obtaining a permit therefor issued by the Director. No person shall make any filling of any description at any point below the line of the mean high tide within the area; or dredge or excavate therein for the benefit or use of any private person without first obtaining a permit therefor issued by the City Council. Such permits shall be issued only to the fee owner of real property fronting on a waterway within the Long Beach Marina area or to a homeowner's association as provided in Section 16.08.780 for a harbor structure in front of or adjacent to the real property. Prior to the issuance of any such permit, the applicant shall submit plans and specifications for each such structure, filling, dredging or excavation to the Director or City Council, whichever is applicable, for approval and shall obtain a coastal development permit from the California Coastal Commission. Each such structure shall conform to the minimum structural requirements of "Plans and Specifications No. R-4858/Revised 10/94, for the Erection of Structures Channelward of the Bulkhead Lines in the Long Beach Marina Area in the City of Long Beach, California". B. Each applicant for a permit under the provisions of this Section shall pay a plan check and an inspection fee as prescribed in regulations enacted pursuant to Section 16.08.970. C. Any permit issued by the Director or the City Council pursuant to this Section shall be void unless the permittee, within sixty (60) days from the date of issuance thereof, commences construction of the structure or operation authorized thereby and proceeds diligently and in good faith therewith or obtains a written extension of time from the Director. D. Each holder of a structure permit issued pursuant to this Section shall pay to the City an annual inspection fee as prescribed in regulations enacted pursuant to Section 16.08.970. E. If any permittee fails or refuses to commence and diligently prosecute to completion any repairs to a harbor structure as ordered by the Director within the time specified thereof and additional inspections of the harbor structure are required, the permittee shall pay to the City a reinspection fee for each occasion the harbor structure is inspected for compliance with the order of repair in an amount prescribed in regulations enacted pursuant to Section 16.08.970. F. No annual inspection fee shall be required in private marinas on private property. G. Permits issued pursuant to the provisions of this Section and Section 16.08.850 will automatically terminate upon a sale of the permittee's interest in the real property unless the permittee requests the same be transferred and the approval of the Director is first obtained. The permittee shall promptly notify the Director of the transfer of ownership, the effective date thereof, and pay to the City a transfer fee as prescribed in regulations enacted pursuant to Section 16.08.970. H. In the event any permittee shall fail or refuse to pay when due any annual inspection fee or transfer fee, the Director shall cancel said permit for which payment is delinquent unless the permittee requests, in writing, and is granted by said Director, an extension of time for payment. Upon cancellation of any permit, the permittee shall remove or cause to be removed the structure and discontinue the activities authorized by said permit within the time specified by the Director. In the event said permittee shall fail to remove the structure and discontinue the activities as directed within the time specified by the Director, the Director shall have the right and authority to immediately remove any such harbor structure at the permittee's cost.

(Ord. C-7590 § 2, 1999: Ord. C-7043 § 4 (part), 1992: Ord. C-5956 §§ 13, 14, 15, 1983; Ord. C-5625 § 4 (part), 1980: prior code § 7224.2)

Ask a question about Long Beach law

Corpus searches the Long Beach sections it holds and shows the ones that match, with their citations. Free, no sign-in.