15.52.420 Completion of work.

A. Final Reports. Upon completion of the rough grading work and at final completion of the work, the city engineer may require the written approvals, reports, plans and supplements specified in Subarticle 8 of the Grading Manual. B. Notification of Completion. The permittee or his or her agent shall notify the city engineer when the grading operation is ready for final inspection. Final approval shall not be given until all work, including installation of all drainage facilities and their protective devices, and all erosion and sediment control measures, including landscaping and its irrigation system, have been completed in accordance with the approved grading plan, and the required reports have been submitted. Where landscape planting for erosion and sediment control has been installed, final clearance, i.e., release of security deposits, shall not be granted until the plantings have become established. The establishment of such erosion and sediment control plantings shall be certified by a licensed landscape architect and approved by the city engineer. (Ord. 349 § 4 (part), 2006: Ord. 346 § 4 (part), 2006: Ord. 97 § 1 (part), 1993: Ord. 3 § 1 (part), 1991: prior code §§ 8.12.100.842--8.12.100.843)

Ask a question about Murrieta law

Corpus searches the Murrieta sections it holds and shows the ones that match, with their citations. Free, no sign-in.