§ 15.62.030 — Pre-submittal requirements
Murrieta Municipal Code (2026 S-23 through Ord. 639-26) · Murrieta Municipal Code § 15.62.030
Corpus is an independent public-information project, not the official City of Murrieta website. Stable reference: corpuslaw.us/code/1656f949-0dab-47ab-b50f-afea694a2760
15.62.030 Pre-submittal requirements.
Prior to submitting an application, the applicant shall: A. Verify to the city's reasonable satisfaction through the use of standard engineering evaluation techniques that the support structure for the small residential rooftop solar energy system is stable and adequate to transfer all wind, seismic, and dead and live loads associated with the system to the building foundation; and B. At the applicant's cost, verify to the city's reasonable satisfaction using standard electrical inspection techniques that the existing electrical system including existing line, load, ground and bonding wiring as well as main panel and subpanel sizes are adequately sized, based on the existing electrical system's current use, to carry all new photovoltaic electrical loads. (Ord. 503 § 1, 2015)
Ask a question about Murrieta law
Corpus searches the Murrieta sections it holds and shows the ones that match, with their citations. Free, no sign-in.
