For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 15.04.2.256 — Section 110.3, Subsections 110.3.1—110.3.4 of CBC Chapter 1 amended

Oakland Municipal Code (Supp. No. 103: codified through Ordinance No. 13873, adopted February 17, 2026) · Oakland Municipal Code § 15.04.2.256

Corpus is an independent public-information project, not the official City of Oakland website. Stable reference: corpuslaw.us/code/f928cd26-4be2-4482-950f-47f7b7dd9d02

15.04.2.256 - Section 110.3, Subsections 110.3.1—110.3.4 of CBC Chapter 1 amended.

In Section 110.3 of Chapter 1 of the California Building Code, add and replace the following subsections with the following: 110.3.0 Preconstruction Inspections Pre-Construction inspection is required for Major Projects with a valuation over $250,000 prior to start of construction activities including grading activities to review project Conditions of Approval issued by Planning and to provide departmental guidance as it relates to inspection sequence, milestones, and Final requirements. All other projects are encouraged but not required to obtain a Pre-Construction inspection. 110.3.1 Major Inspection—Foundation Before concrete or grout is placed, approval of a Foundation Inspection shall be contingent upon project adherence to Best Management Practices (BMPs), receipt and approval of required certifications, tests, and reports; receipt of fees, including investigation, re-inspection, compliance monitoring, and increased valuation of work; receipt of required City and outside agency approvals; removal of vegetation and completion of excavations for footings; installation and approval of required forms, reinforcing and prestressing steel, and structural embedments; and installation and approval of required electrical, mechanical, plumbing, fire extinguishing, and communication conduits, pipes, ducts, inserts, embedments, and similar systems, components, or ancillary equipment items. Where inspection is performed under the requirements of California Building Code Chapter 17 (Special Inspections), receipt of certifications, tests and reports resulting from such inspection shall be received prior to approval or partial approval of any Major Inspection. All materials for the foundation not otherwise required to be secured in place shall be on the jobsite, except for concrete which is ready mixed in accordance with CBC Standard No. 193. 110.3.2 Major Inspection—Concrete Slab or Under Floor Before concrete is placed or floor sheathing is installed, including subfloor, approval of a Concrete Slab or Under Floor Inspection shall be contingent upon continued project adherence to Best Management Practices (BMPs), receipt and approval of required certifications, in flood hazard areas, upon placement of lowest floor, including the basement, and prior to vertical construction, the elevation certification requires in CBC Section 1612.4 or the CRC shall be submitted to the Building official, tests, and reports; receipt of fees, including investigation, reinspection, compliance monitoring, and increased valuation of work; receipt of required City and outside agency approvals; installation and approval of required forms, reinforcing and prestressing steel, and structural embedments; and installation and approval of required in-slab or under-floor required electrical, mechanical, plumbing, fire extinguishing, and communications conduits, pipes, ducts, vents, vapor barriers, insulation, and similar systems, components, or ancillary equipment items. Where inspection is performed under the requirements of California Building Code Chapter 17 (Special Inspections) of the California Building Code, receipt of certifications, tests and reports resulting from such inspection shall be received and approved prior to approval or partial approval of any Major Inspection. Where under-floor conditions and clearances are determined to be readily accessible as defined herein, the Building Official may authorize and approve the installation of sub-floor/floor sheathing prior to the satisfaction of all conditions specified in paragraph one of this Section. All documents related to off-site manufacture, third party approval/inspection of materials or workmanship must be received and approved by the Building Official prior to approval or partial approval of any subsequent work which is supported by the concrete slab or foundation and sub-floor assembly. 110.3.3 Major Inspection—Frame Approval of a Frame (Rough) Inspection shall be contingent upon continued project adherence to Best Management Practices (BMPs) receipt and approval of required certifications, tests, moisture content verification, and reports; receipt of fees, including investigation, re-inspection, compliance monitoring, and increased valuation of work; receipt of required City and outside agency approvals, including off-site fabrication of components; installation and approval of weatherproofing for the roofing system, all framing, fire blocking, fire-resistance ratings, draft stopping, fire and smoke resistant penetrations and bracing; installation of noise and energy-saving materials including: insulating materials, fenestration, duct systems, HVAC, and water heating equipment; installation and approval of chimneys; and installation and approval of required electrical, mechanical, plumbing, fire extinguishing, and communication conduits, pipes, ducts, inserts, embedment, and similar systems, components, or ancillary equipment items. Prior to approval of frame where balconies or other elevated walking surfaces have weather-exposed surfaces, and the structural framing is protected by an impervious moisture barrier, all elements of the impervious moisture barrier system shall not be concealed until inspected and approved. Except: Where special inspections are provided in accordance with Section 1705.1.1, Item 3. Additionally, approval of the Frame inspection shall be contingent upon approval of the lath or gypsum wallboard inspection. No work shall be concealed until specific approval has been given (framing, etc.). 110.3.4 Major Inspection—Final Approval of a Final Inspection shall be contingent upon continued project adherence to project Conditions of Approval, Best Management Practices (BMPs), approval of all other required inspections; receipt and approval of required certifications, in flood hazard areas, documentation of elevation of lowest floor as required in CBC Section 1612.4 or the CRC shall be submitted to the Building official tests, and reports; receipt of fees; receipt of required City and outside agency approvals; completion and approval of finish grading and all public and site improvements; installation and approval of all electrical, mechanical, plumbing, fire extinguishing, and communication conduits, pipes, ducts, vents, insulation, vapor barriers, and similar systems, components, or ancillary equipment; and the building being completed and ready for occupancy. Delete sections 110.3.5,110.3.6,110.3.7, 110.3.8, 110.3.9, 110.3.10, 110.3.11, 110.3.12 in their entirety.

(Ord. No. 13861, § 4, 9-15-2025) (Ord. No. 13861, § 4, 9-15-2025)

Ask a question about Oakland law

Corpus searches the Oakland sections it holds and shows the ones that match, with their citations. Free, no sign-in.