For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 15.08.570 — Qualifications of persons employed to perform lead hazard control or removal

Oakland Municipal Code (Supp. No. 103: codified through Ordinance No. 13873, adopted February 17, 2026) · Oakland Municipal Code § 15.08.570

Corpus is an independent public-information project, not the official City of Oakland website. Stable reference: corpuslaw.us/code/ff48eef4-6cae-4c96-ac20-b01528daaca4

15.08.570 - Qualifications of persons employed to perform lead hazard control or removal.

All individuals hired or employed by an owner, agent, or responsible party to perform lead-related construction, hazard control, removal, or abatement within the City must have a State of California Interim Certification, or Environmental Protection Agency (EPA) Certification when such certification is available through the California State Department of Health Services. In accordance with the Lead Renovation, Repair, and Painting (RRP) rule, those who receive compensation for renovations in housing and child-occupied facilities built before 1978 must follow certain requirements. The requirements, at a minimum, include the following: • The firm that performs the work must possess RRP firm certification from EPA. • The job supervisor employed by the firm must have an individual renovator certification and be able to present that certification at any time. • Each worker must either have an individual renovator certification or have been trained by a supervisor with individual renovator certification. • The firm must provide the "Renovate Right" brochure to owners and/or tenants before the work begins. • The firm must maintain adequate written records for three (3) years. • The firm or workers hired by the firm must perform, at the minimum, the following at the worksite: • Post signs clearly defining the work area and warning occupants and other persons not involved in renovation activities to remain outside of the work area; • Contain the work area so that dust and paint chips do not leave the work area; • Close windows, doors and/or ducts to minimize exposure to lead dust and chips; • Cover the floor/ground with plastic sheeting (six (6) to ten (10) feet wide in most cases); • If using machines to sand, grind, plane, or sandblast, the machine must be connected to a high efficiency particulate air (HEPA) vacuum; • At the end of each work day, waste must be collected, contained and stored safely to prevent access to dust and debris or the release of dust and debris; • Properly dispose of waste; and • Clean work area so no dust, debris or residue remains after project is finished.

(Ord. No. 13719, § 5, 12-20-2022)

Ask a question about Oakland law

Corpus searches the Oakland sections it holds and shows the ones that match, with their citations. Free, no sign-in.