15.33.090 - Permit review and inspection requirements.
A. The City of Oakland Bureau of Building shall adopt an administrative, nondiscretionary review process to expedite approval of small residential rooftop solar energy systems within 90 days of the adoption of this Chapter. The Bureau of Building shall approve the application and issue a building permit or other nondiscretionary permit on the same day for over-the-counter applications (or within one to three business days for electronic applications) of receipt of a complete application that meets the requirements of the approved checklist and standard plan. If an application is deemed incomplete, the City shall issue a written correction notice detailing all deficiencies in the application and any additional information or documentation required to be eligible for expedited permit issuance. 1. Review of the application shall be limited to the building official's review of whether the application meets all health and safety requirements of local, state, and federal law. However, if the building official makes a finding, based on substantial evidence, that the solar energy system could have a specific, adverse impact upon the public health or safety, the building official may require an applicant to apply for a use permit. 2. The building official may not deny an application for a use permit to install a solar energy system unless he or she makes written findings based upon substantive evidence in the record that the proposed installation would have a specific, adverse impact upon public health or safety and there is no feasible method to satisfactorily mitigate or avoid the specific, adverse impact. The findings shall include the basis for the rejection of potential feasible alternatives for preventing the adverse impact. B. Any conditions imposed on an application shall be designed to mitigate the specific, adverse impact upon health and safety at the lowest possible cost. Furthermore, the City shall not condition approval of an application on the approval of an association. C. If an inspection is required, only one inspection shall be required and performed by the Bureau of Building for small residential rooftop solar energy systems eligible for expedited review. Inspections for permit requirements of the Uniform Fire Code Section 105.7 shall be performed by the Bureau of Building as part of this inspection. D. The inspection shall be done in a timely manner and should include consolidated inspections. An inspection will be scheduled within two business days of a request. If a small residential rooftop solar energy system fails inspection, subsequent inspections deemed necessary by the City are authorized, however the subsequent inspection need not conform to the requirements of this Section.
(Ord. No. 13332, § 2(Exh. A), 10-20-2015)
Ask a question about Oakland law
Corpus searches the Oakland sections it holds and shows the ones that match, with their citations. Free, no sign-in.