§ 37.125 — Irrigation schedule
The Code of the City of Oceanside, California (Supp. No. 50: codified through Ordinance No. 26-OR0412-1, enacted June 17, 2026) · Oceanside City Code § 37.125
Corpus is an independent public-information project, not the official City of Oceanside website. Stable reference: corpuslaw.us/code/83304112-5356-49b2-9940-abe39811b268
Sec. 37.125. - Irrigation schedule.
The irrigation schedule required by Section 37.120, shall be prepared by a licensed landscape architect, or other professional licensed by the state to do this work and provide the following information: (1) A description of the automatic irrigation system that will be used for the project. (2) The ETo data relied on to develop the irrigation schedule, including the source of the data. (3) The time period when overhead irrigation will be scheduled and confirm that no overhead irrigation shall be used between 10:00 a.m. and 6:00 p.m. (4) The parameters used for setting the irrigation system controller for watering times for: a. The plant establishment period. b. Established landscaping. c. Temporarily irrigated areas. d. Different seasons during the year. (5) The consideration used for each station for the following factors: a. The days between irrigation. b. Station run time in minutes for each irrigation event, designed to avoid runoff. c. Number of cycle starts required for each irrigation event, designed to avoid runoff. d. Amount of water to be applied on a monthly basis. e. The root depth setting. f. The plant type setting. g. The soil type. h. The slope factor. i. The shade factor.
(Ord. No. 10-OR0412-1, § 1, 5-26-2010)
Ask a question about Oceanside law
Corpus searches the Oceanside sections it holds and shows the ones that match, with their citations. Free, no sign-in.