For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 9A.1.7 — General conditions upon construction, operation and repair

The Code of the City of Oceanside, California (Supp. No. 50: codified through Ordinance No. 26-OR0412-1, enacted June 17, 2026) · Oceanside City Code § 9A.1.7

Corpus is an independent public-information project, not the official City of Oceanside website. Stable reference: corpuslaw.us/code/ce45bc76-f3a1-466d-aef9-a7f6c4a376b1

Sec. 9A.1.7. - General conditions upon construction, operation and repair.

(a) Franchisee must follow local rules. The construction, operation, and repair of cable communications systems shall be performed in compliance with all laws, ordinances, departmental rules, regulations, and practices affecting such system. By way of example, and not limitation, this includes zoning and safety codes, construction standards, regulations for providing notice, to persons that may be affected by system construction, and directives governing the time, place and manner in which facilities may be installed in the rights-of-way. Persons engaged in the construction, operation, or repair of communications facilities shall exercise reasonable care in the performance of all their activities and shall use commonly accepted methods and devices for preventing failures and accidents that are likely to cause damage, injury, or nuisance to the public or to property. (b) No permit without franchise. A franchise is required before a permit may be issued for work associated with the construction of a cable communications system. Any permit issued for such work to a person that does not hold a franchise shall vest no rights in the permittee; the permit may be revoked at will, and the permittee shall remove all facilities installed under the permit upon the city's demand. (c) Permits must be obtained. Construction, operation, or repair of a cable communications system shall not commence until all required permits have been obtained from the city and all required fees have been paid. All work performed shall be performed in strict accordance with the conditions of the permit. Upon order of the city, any work and/or construction undertaken that is not completed in compliance with the city's requirements, or which is installed without obtaining necessary permits and approvals shall be removed. (d) No interference. Interference with the use of the public rights-of-way by others, including others that may be installing cable communications systems, must be minimized. The city may require a person using the rights-of-way to cooperate with others through joint trenching and other arrangements to minimize adverse impacts on the rights-of-way. (e) Use of existing infrastructure. Each cable communications system operator shall utilize existing poles, conduits, and other facilities whenever possible, and shall not construct or install any new, different, or additional poles, conduits, or other facilities whether on public property or on privately owned property unless and until first securing the written approval of the city engineer. (f) Undergrounding. (1) Whenever all existing utilities are located underground in an area in the city, every cable communications system operator in the same area must locate its cable communications system underground. (2) Whenever the owner of a pole locates or relocates underground within an area of the city, every cable communications system operator in the same area shall concurrently relocate its facilities underground at no cost to the city. (3) The city manager may, for good cause shown, exempt a particular system or facility or group of facilities from the obligation to locate or relocate facilities underground, where relocation is impractical, unreasonable, or where the interest in protecting against visual blight can be protected in another manner. Nothing in this subsection (f) shall prevent the city from ordering cable communications facilities to be located or relocated underground under other provisions of the City Code. (g) Prompt repairs. Any and all public rights-of-way, other public property, or private property that is disturbed or damaged during the construction, operation or repair of a cable communications system shall be promptly repaired by the operator. Public property and public rights-of-way must be restored to a condition as good or better than before the disturbance or damage occurred. Costs associated with the restoration of the public property or public rights-of-way to the condition described above shall be the responsibility of the cable system operator. (h) Tree trimming. Any tree trimming must be performed in strict accordance with the Oceanside City Code and tree trimming guidelines. (i) Movement of facilities for government. (1) A cable communications system operator shall, by a time specified by the city, protect, support, temporarily disconnect, relocate, or remove any of its property when required by the city by reason of traffic conditions; public safety; public right-of-way construction and repair (including regrading, resurfacing or widening); public right-of-way vacation; construction, installation or repair of sewers, drains, water pipes, power lines, signal lines, tracks, or any other type of government-owned system or utility, public work, public facility, or improvement; or for any other purpose where the work involved would be aided by the removal or relocation of the cable communications system. Collectively, such matters are referred to below as the "public work." (2) The city shall provide written notice describing where the public work is to be performed at least forty-five (45) days prior to the deadline by which a cable communications system operator must protect, support, temporarily disconnect, relocate or remove its facilities. Operator(s) shall not be deemed in breach of this section if operator cannot comply due to reasons beyond its control. Provided that, in an emergency, or where a cable communications system creates or is contributing to an imminent danger to health, safety, or property, the city may protect, support, temporarily disconnect, remove, or relocate any or all parts of the cable communications system without prior notice, and charge the cable communications system operator for costs incurred. (j) Movement for others. (1) To accommodate the construction, operation, or repair of the facilities of another person authorized to use the streets or public property, a franchisee shall, by a time specified by such person, protect, support, temporarily disconnect, relocate or remove its facilities. The franchisee must be given written notice describing where the construction, operation or repair is to be performed no less than forty-five (45) days prior to the time by which its work must be completed. Operator(s) shall not be deemed in breach of this section if operator cannot comply due to reasons beyond its control. The city may resolve disputes as to responsibility for costs associated with removal, relaying, or relocation of facilities among entities authorized to install facilities in the streets or on public property if such entities are unable to do so themselves. (2) A cable communications system operator shall, at the request of any person holding a valid permit issued by a governmental authority, temporarily raise or lower its wires by a time specified to permit the moving of buildings or other objects. A cable communications system operator shall be given not less than fourteen (14) days advance notice to arrange for such temporary wire changes. The expense of such temporary removal or raising or lowering of wires shall be paid by the person requesting the same. (k) Abandonment in place. (1) A cable communications system operator may abandon any property in place in the public rights-of-way upon written notice to the city. However, if, within ninety (90) days of the receipt of written notice of abandonment, the city determines, that the safety, appearance, functioning or use of the public right-of-way and facilities in the public right-of-way will be adversely affected, the property must be removed by a date specified by the city. (2) A cable communications system operator that abandons its property must, upon request, transfer ownership of the properties to the city at no cost, and execute necessary quitclaim deeds and indemnify the city against future costs associated with mitigating or eliminating any environmental hazard associated with the abandoned property. (l) System subject to inspection. Every cable communications facility shall be subject to inspection and testing by the city. Each operator must respond to requests for information regarding its system and plans for the system as the city may from time to time issue, including requests for information regarding its plans or construction, operation and repair and the purposes for which the plant is being constructed, operated, or repaired. Such information and plans, if marked as confidential and proprietary when provided to the city, will be treated by the city as such to the maximum extent allowed by law. (m) Underground services alert. Each operator of a cable communications system that places facilities underground shall be a member of the regional notification center for subsurface installations (underground services alert) and shall field mark the locations of its underground communications facilities upon request. The operator shall locate its facilities for the city at no charge. (n) Plan for construction. Each cable communications system operator shall provide the city a plan for any initial system construction, or for any substantial rebuild, upgrade or extension of its facility, which shall show its timetable for construction of each phase of the project, and the areas of the city that will be affected. Such information and plans, if marked as confidential and proprietary when provided to the city, will be treated by the city as such to the maximum extent of the law. (o) Use of facilities by city. The city shall have the right to install and maintain, free of charge, upon any poles or in any conduit owned by a franchisee any wire and pole fixtures that do not unreasonably interfere with the cable service operations of the franchisee. Should a franchisee demonstrate its need to have the pole or conduit capacity returned, the city shall remove its facilities at no charge to franchisee. In the event that the city's facilities or actions damage an operator's system, the city shall waive all relevant technical, customer service and other standards that result from the damage. The city shall reimburse franchisee for any damage to franchisee's facilities caused by the city's use of franchisee's facilities. An operator shall be held harmless from any responsibility for damage to the city equipment resulting from the operator's normal use and operation of the operator equipment. The city shall not use a franchisee's facilities to offer competitive commercial cable services. (p) Unsightly system installation. In all sections of the city where wires, cables and other system appurtenances are mounted above ground, every reasonable effort shall be made to minimize obstruction of the view of residents, and every reasonable effort shall be made to preclude an unsightly system installation. Incidental appurtenances such as amplifier boxes and pedestal mounted terminal boxes may be placed above ground, but shall be of such size and design as to blend with the existing surroundings and shall be so located as not to be unsightly or hazardous to the public.

(Ord. No. 01-56-1, § 2(1.7.1—1.7.16), 2-7-01; Ord. No. 02-OR499-1, § 2, 7-10-02)

Ask a question about Oceanside law

Corpus searches the Oceanside sections it holds and shows the ones that match, with their citations. Free, no sign-in.