Sec. 6-3.602. Construction and demolition recycling plan.

Wastes going to landfill from construction and demolition activities must be minimized to the greatest extent possible by recycling, deconstruction for reuse, or by use of "green building" practices. Material targeted for recycling shall include concrete, asphalt, clean wood (unpainted or untreated), brick, metal, cardboard and sheetrock. The City Manager may modify the targeted materials based on available markets. (a) A construction and demolition recycling plan shall be submitted for conducting the following types of development activities: (1) The construction of any structure; (2) Additions or alterations of non-residential structures; (3) Additions or alterations of residential structures that increase the structure's conditioned area, volume or size. (b) In preparing the construction and demolition recycling plan, customers for building or demolition permits involving the removal of all or part of an existing structure shall consider deconstruction to the maximum extent feasible. (c) Plans may be required to be submitted on City-approved forms. Plans shall ensure the diversion of at least sixty-five percent (65%) of the total construction and demolition debris generated by the project for reuse or recycling, and shall include, but not be limited to, the following information: (1) The estimated volume or weight of the project construction and demolition debris to be generated, by materials type, the estimated volume or weight of construction and demolition debris that can feasibly be diverted for reuse or recycling, and the estimated volume or weight of construction and demolition debris that will be hauled as refuse. In estimating the volume or weight of materials identified in the construction and demolition recycling plan, the customer shall use the standardized conversion rates approved by the City for this purpose; (2) A drawing that identifies an area for the loading and collection of recyclable materials, with appropriate access for collection vehicles; (3) A description of how the materials will be separated at the source and/or recycled by utilizing the services of a processor; (4) Identification of the recycled materials to be used in the construction or remodeling of the facility; (5) Identification of the proposed vendor or facility proposed to collect or receive recycled material; and (6) A description of green building practices in use, if any. (d) All customers with projects subject to the provisions of this chapter shall implement, at a minimum, the measures identified in the construction and demolition recycling plan, and shall demonstrate compliance with the following construction-site requirements: (1) Construction waste and demolition debris shall be removed from the construction site on a regular basis, and shall not be stored on site and in the open for a period in excess of four (4) weeks, provided that such waste is not hazardous or noxious and does not constitute a nuisance, in which case it must be appropriately secured and regularly removed from the construction site; (2) Reasonable efforts shall be demonstrated to provide for segregation of recyclable construction materials and demolition debris for diversion from landfills; and (3) Construction waste and demolition debris that may become windblown shall be containerized to prevent litter. (e) No demolition permit or building permit shall be issued for any development activity subject to this chapter, unless the construction and demolition recycling plan has been approved by the City. (f) The issuance of the certificate of occupancy will be conditional on submittal of a report that documents the construction and demolition debris recycled. The report shall be submitted to the Administrator and shall contain the following information: (1) The estimated and actual quantities of all construction waste and demolition debris listed in the construction and demolition recycling plan; (2) Copies of recycling receipts or other pertinent documentation that demonstrate waste diversion and recycling in conformance with the approved construction and demolition recycling plan. Customers shall make reasonable efforts to ensure that all construction and demolition debris diverted for recycling or hauled to a landfill are measured and recorded using the most accurate method of measurement available. To the extent practical, all construction and demolition debris shall be weighed by measurement on scales in compliance with all regulatory requirements for accuracy and maintenance. For construction and demolition debris for which weighing is not practical due to small size or other considerations, a volumetric measurement shall be used. For conversion of volumetric measurements to weight, customers shall use the standardized conversion rates approved by the City for this purpose; and (3) Any additional information the customer believes is relevant to determining its efforts to comply in good faith with this section. (§ 1, Ord. 3187, eff. January 1, 2022)

Ask a question about Ontario law

Corpus searches the Ontario sections it holds and shows the ones that match, with their citations. Free, no sign-in.