§ 6-7.509 — Notifications
City of Ontario, California, Municipal Code (2026 S-32: Current through Ordinance 3338, passed 7-21-2026) · Ontario Municipal Code § 6-7.509
Corpus is an independent public-information project, not the official City of Ontario website. Stable reference: corpuslaw.us/code/430ccdd3-ef69-41c2-a24d-febe8d414ae5
Sec. 6-7.509. Notifications.
(a) Accidental discharge. (1) In the event the user is unable to comply with any of the permit conditions due to a breakdown of equipment, accidents caused by human error or acts of God, or the discharge will exceed the discharge limitations in the permit, the user shall notify the City and IEUA by immediately telephoning as soon as the user has knowledge of the incident: City of Ontario: Utilities (909)395-2678 Monday-Friday 8:00 a.m. to 5:00 p.m. Fire (909) 983-5911 All other hours. Inland Empire Utilities Agency: POTW (909) 947-4131 Anytime. (2) The user shall confirm the notification in writing as soon as possible, but no later than five (5) working days from the telephone notification. Written notification shall state the date of the incident, reasons for the discharge or spill, steps that were taken to immediately correct the problem, and steps being taken to prevent the problem from recurring. (3) Such notification shall not relieve the user of any expense, loss, damage or other liability which may be incurred as a result of damage or loss to the IEUA and/or the City or any other damage or loss to user or property; nor shall such notification relieve the user of any fees or other liability which may be imposed by this chapter or other applicable law. (4) A notice shall be permanently posted on the user's employee bulletin board or other prominent place advising employees whom to call in the event of an accidental discharge, spill or slug loading. Users shall ensure that all employees who may cause such a discharge to occur are advised of the emergency notification procedure. (b) Change to discharge. All users shall notify the City before making substantial changes to their process wastewater discharges. Substantial changes include: (1) Operational flows, changes of + 20%; (2) Pollutant loadings, changes of + 20%; (3) Changes in the characteristics of their process flows; (4) On-site plumbing; or (5) Pretreatment procedures and/or facilities. All users shall notify the City a minimum of thirty (30) days prior to any planned changes. Upon notification, the Administrator may require that a new application be filed and a new permit obtained before discharging any waste involving the changed characteristics. (c) Discontinued discharge. (1) The user shall notify the Administrator at least ten (10) days prior to discontinuing its industrial wastewater discharge for more than thirty (30) days unless the user can demonstrate to the Administrator that it could not have known of the discontinued discharge. (2) Within thirty (30) days of the discontinued discharge, the user shall remove the contents of all on-site sewers, sumps, floor drains, wastewater storage tanks, and/or pretreatment facilities in accordance with all applicable regulations. The contents shall not be discharged to the public sewer without prior written approval from the Administrator. (3) If the user fails to clean up and remove the contents of its facilities to the satisfaction of the Administrator, such activities and the costs thereof shall also become the responsibility of the owner of the building and/or land. (4) Failure of the user or the owner to promptly and satisfactorily clean up and remove the contents of all on-site sewers, sumps, floor drains, wastewater storage tanks, and/or pretreatment facilities shall subject the user and the owner of the building and/or land to any enforcement action authorized in this chapter. (d) Hazardous waste discharge. (1) The user shall notify the Administrator, the IEUA, the EPA Regional Waste Management Division Director, and State Hazardous Waste authorities in writing of any discharge into the sewerage system of a substance, which, if otherwise disposed of, would be a hazardous waste under 40 CFR part 261. (2) Such notification must include the name of the hazardous waste as set forth in 40 CFR part 261, the EPA hazardous waste number, and the type of discharge (continuous, batch, or other). (3) If the user discharges more than one hundred (100) kilograms of such waste per calendar month to the sewerage system, the notification shall also contain the following information to the extent such information is known and readily available to the user: an identification of the hazardous constituents contained in the wastes, an estimation of the mass and concentration of such constituents in the wastestream discharged during that calendar month, and an estimation of the mass of constituents in the wastestream expected to be discharged during the following twelve (12) months. (4) Any notification under this chapter must be submitted only once for each hazardous waste discharged. Discharges are exempt from the requirements of subsection (a) of this section during a calendar month in which the discharge is no more than fifteen (15) kilograms of hazardous wastes, unless the wastes are acute hazardous wastes as specified in 40 CFR 261.30(d) and 261.33(e). Discharges of more than fifteen (15) kilograms of non-acute hazardous wastes in a calendar month, or of any quantity of acute hazardous wastes as specified in 40 CFR 261.30(d) and 261.33(e), requires a one-time notification. Subsequent months during which the user discharges more than such quantities of any hazardous waste do not require additional notification. (5) In the case of any new regulations under § 3001 of RCRA identifying additional characteristics of hazardous waste or listing any additional substance as hazardous waste, the user must notify the Administrator, the IEUA, the EPA Regional Waste Management Division Director, and State Hazardous Waste authorities of the discharge of such substance within ninety (90) days of the effective date of such regulations. (6) In the case of any notification made under this chapter, the user shall certify that it has a program in place to reduce the volume and toxicity of hazardous wastes. (7) The notification requirement in this section does not apply to pollutants already reported under the self-monitoring requirements of 40 CFR 403.12(b), (d), and (e). (e) Bypass. Bypass of industrial wastewater to the City sewerage system is prohibited. The City may take enforcement action against a user, unless the permittee submitted notices as required by § 6-7.509 or met conditions as specified in § 6-7.210. (§ 3, Ord. 2755, eff. April 4, 2002, as amended by § 19, Ord. 2816, eff. December 1, 2005)
Ask a question about Ontario law
Corpus searches the Ontario sections it holds and shows the ones that match, with their citations. Free, no sign-in.
