§ 8-15.304 — Roof/ceiling construction
City of Ontario, California, Municipal Code (2026 S-32: Current through Ordinance 3338, passed 7-21-2026) · Ontario Municipal Code § 8-15.304
Corpus is an independent public-information project, not the official City of Ontario website. Stable reference: corpuslaw.us/code/9e073120-3850-4850-bb03-2736a83a5683
Sec. 8-15.304. Roof/ceiling construction.
(a) Roof rafters shall have a minimum slope of 4:12 and shall be covered on their top surface with one-half (½) inch solid sheathing and any roof covering allowed by this Code. (b) Attic insulation shall be batt or blown-in glass fiber or mineral wool with a minimum R-30 rating applied between the ceiling joists. (c) Attic ventilation shall be: (1) Gable vents or vents that penetrate the roof surface that are fitted with transfer ducts at least six (6) feet in length that are insulating flexible ducting or metal ducts containing internal one (1) inch thick coated fiberglass sound absorbing duct liner. Each duct shall have a lined ninety (90) degree bend in the duct so that there is no direct line-of-sight from the exterior through the duct into the attic; or (2) Noise control louver vents; or (3) Eave vents that are located under the eave overhang. (d) Ceilings shall be finished with gypsum board or plaster that is at least five-eighths ( 5/8 ) inch thick. (e) Skylights shall penetrate the ceiling by means of a completely enclosed light well that extends from the roof opening to the ceiling opening. A secondary openable glazing panel shall be mounted at the ceiling line and shall be glazed with at least three-sixteenths (3/16) inch plastic, tempered or laminated glass. (§ 2, Ord. 2616, eff. June 20, 1996)
Ask a question about Ontario law
Corpus searches the Ontario sections it holds and shows the ones that match, with their citations. Free, no sign-in.