§ 8-19.050 — Time period for compliance/priority designation
City of Ontario, California, Municipal Code (2026 S-32: Current through Ordinance 3338, passed 7-21-2026) · Ontario Municipal Code § 8-19.050
Corpus is an independent public-information project, not the official City of Ontario website. Stable reference: corpuslaw.us/code/b4872c89-aa0e-4405-9074-3e8ddd4919d6
Sec. 8-19.050. Time period for compliance/priority designation.
(a) Plan permits and construction. Each building within the scope of this chapter shall be structurally altered to comply with the minimum standards in this chapter within the time periods shown in Table A. Minimum plan requirements shall be as specified by the Building Official. (b) Screening form. Within the time limits allowed in Table A, if the owner of any building believes he/she is not subject to the provisions of this chapter, owner shall submit a screening form to the Building Department. The screening form shall be completed by a licensed civil or structural engineer and shall state whether the structure conforms to the earthquake design provisions contained in this chapter. Retrofit of said building shall not be required if screening form determines that the structure conforms with the earthquake design provisions of this chapter, as determined by the Building Official. Retrofit of said building shall be required if owner fails to submit the screening form within the time limit specified in Table A or if the screening form determines that the structure does not conform with the design requirements of this chapter. The requirement for said retrofit is not appealable if the screening form states that the structure does not conform to the earthquake design provisions contained in this chapter. TABLE ATIME PERIOD FOR COMPLIANCE | Required | Action | By Owner Risk Level | Submit Structural Assessment | Plan and Obtain Permit | Complete Construction Risk Level | 9 months from notice to owner | 9 months from structural assessment submittal | 18 months from plan/permit approval Medium Risk | 12 months from notice to owner | 12 months from structural assessment submittal | 24 months from plan/permit approval Low Risk | 18 months from notice to owner | 12 months from structural assessment submittal | 24 months from plan/permit approval (c) Priority designations. The Building Official shall prioritize enforcement of this chapter as defined in Table B. TABLE BPRIORITY DESIGNATION Risk Level | Description High Risk | Parcels containing buildings with three or more stories, or containing 25 or more dwelling units total, or qualified historic buildings (any size or number of units) Medium Risk | Parcels containing ten to 24 units total Low Risk | All parcels containing non-historic, two-story buildings with two to nine units total (§ 2, Ord. 3325, eff. February 19, 2026)
Ask a question about Ontario law
Corpus searches the Ontario sections it holds and shows the ones that match, with their citations. Free, no sign-in.