§ 13.16.050 — Water for New Construction
Municipal Code, City of Orange, California (through Ord. No. 01-26 adopted January 27, 2026) · Orange Municipal Code § 13.16.050
Corpus is an independent public-information project, not the official City of Orange website. Stable reference: corpuslaw.us/code/f10b226f-6144-4f7c-9de8-cac7ac9316ad
§ 13.16.050: Water for New Construction.
A. For water for new construction, application must be made in the regular manner and a meter shall be installed by the Public Works Department Water Division, which installation shall be paid for by the applicant before any water is turned on. The charge for such water shall be paid for at the regular water rates specified in Section 13.16.040. B. If the developer desires to use temporary unmetered water through spacers for structural construction, he or she may apply for "unmetered water" for a three-month period on application to the Public Works Department Water Division. Billing charges for such services shall be set forth by resolution of the City Council. After the three-month period has expired and the developer has not removed his or her spacers, the City shall have the right to remove the spacers to the individual lot. C. A meter will be required before any landscaping is done or building is occupied.
( Prior code 7611(d) ; Reso. 2244 ; Reso. 5766 ; Reso. 6181 ; Reso. 7492 ; Ord. 30-74 ; Ord. 19-96 ; Ord. 03-25 , 2/25/2025 )
Ask a question about Orange law
Corpus searches the Orange sections it holds and shows the ones that match, with their citations. Free, no sign-in.
