§ 13.44.020 — Design of Mains—Plan Check Fee
Municipal Code, City of Orange, California (through Ord. No. 01-26 adopted January 27, 2026) · Orange Municipal Code § 13.44.020
Corpus is an independent public-information project, not the official City of Orange website. Stable reference: corpuslaw.us/code/4a2f120e-a872-4821-9ba3-af7d83d884d8
§ 13.44.020: Design of Mains—Plan Check Fee.
A. Each applicant for service to more than a single lot, such as for a subdivision, shall furnish to the Water Department copies of the map of the proposed subdivision, or other such development, as approved by the City. The Public Works Department, Water Division, shall design the required water system with the necessary mains, valves, fire hydrants, etc., indicating sizes and locations. Charges and estimated costs shall be based upon the water system so designed. B. A plan check fee which shall represent the cost to the City for the processing of development plans, including engineering, clerical and administrative personnel utilized to design the required water system and review other required plans or drawings, prepare invoices and otherwise service the development, shall be as set forth by resolution of the City Council. Said fee will be applicable to all developments and shall be invoiced with other applicable Public Works Department, Water Division, charges and payable prior to issuance of building permit or City Council approval of final tract map.
( Reso. 7419 ; Ord. 13-84 ; Ord. 19-96 ; Ord. 03-25 , 2/25/2025 )
Ask a question about Orange law
Corpus searches the Orange sections it holds and shows the ones that match, with their citations. Free, no sign-in.
