For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13.66.180 — Drawing Submittal Requirements

Municipal Code, City of Orange, California (through Ord. No. 01-26 adopted January 27, 2026) · Orange Municipal Code § 13.66.180

Corpus is an independent public-information project, not the official City of Orange website. Stable reference: corpuslaw.us/code/1ee45ae3-f01d-49c5-9b12-948a428a60c3

§ 13.66.180: Drawing Submittal Requirements.

Upon request by the City: A. FSEs may be required to submit facility site plans, mechanical and plumbing plans, and other details to show all sewer locations and connections. The submittal shall be in a form and content acceptable to the City for review of an existing or proposed grease control device, grease interceptor, monitoring facilities, metering facilities, and operating procedures. The review of the plans and procedures shall in no way relieve an FSE of the responsibility of modifying the facilities or procedures in the future, as necessary, to meet the requirements of this chapter or any requirements of other regulatory agencies. B. The City may require drawings to be prepared by a California Registered Civil, Chemical, Mechanical, or Electrical Engineer.

( Ord. 17-04 )

Ask a question about Orange law

Corpus searches the Orange sections it holds and shows the ones that match, with their citations. Free, no sign-in.