§ 13.86.020: Underground Construction.

In all areas of the City where electric utility and communications facilities are underground, the grantee shall place its cables and distribution equipment underground. When existing aerial utilities in any City area are converted to underground construction, such that both electric and communications utilities are underground, the grantee shall replace aerial facilities with underground facilities concurrently and in cooperation with similar programs of the telephone and power utilities. All underground wires or cable of grantee shall be placed in conduits or other materials approved by the Director of Public Works. Amplifiers in grantee's transmission and distribution lines may be placed in appropriate pedestals provided that approval has been obtained from the Director of Public Works prior to excavation.

( Prior code 6811 ; Ord. 32-79 ; Ord. 23-95 )

Ask a question about Orange law

Corpus searches the Orange sections it holds and shows the ones that match, with their citations. Free, no sign-in.