§ 15.60.150: Duties and Responsibilities of the Floodplain Administrator.
The duties and responsibilities of the Floodplain Administrator shall include, but not be limited to: A. Permit Review. 1. Review all development permits, including manufactured homes, substantial improvement and substantial damage of existing structures, to determine that the permit requirements of this chapter have been satisfied. 2. All other required state and federal permits required for floodplain management purposes have been obtained. 3. The site is reasonably safe from flooding. 4. Require, until a regulatory floodway is designed, that no new construction, substantial improvements, or other development (including fill) shall be permitted within Zones A1-30 and AE on the community's FIRM, unless it is demonstrated that the cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the water surface elevation of the base flood more than one foot at any point within the community. 5. All Letters of Map Revision (LOMRs) for flood control projects are approved prior to the issuance of building permits. Building Permits must not be issued based on Conditional Letters of Map Revision (CLOMRs). Approved CLOMRs allow construction of the proposed flood control project and land preparation as specified in the "start of construction" definition. B. Use of Other Base Flood Data. When base flood elevation data has not been provided in accordance with Section 15.60.070, the Floodplain Administrator shall obtain, review, and reasonably utilize any base flood elevation and floodway data available from a federal, state, or other source, in order to administer the portion of the chapter concerning flood hazard reduction. Any such information shall be submitted to the City Council for adoption. C. Whenever a watercourse is to be altered or relocated: 1. Notify adjacent communities and the California Department of Water Resources prior to such alteration or relocation of a watercourse, and submit evidence of such notification to the Federal Insurance Administration; 2. Require that the flood carrying capacity of the altered or relocated portion of said watercourse is maintained. For purposes of this section, a watercourse is any naturally occurring drainage channel which carries drainage runoff from upstream tributary areas as shown on Flood Insurance Rate Maps (FIRM). D. Whenever base flood elevation changes due to physical alterations: 1. Within six months of information becoming available or project completion, whichever comes first, the floodplain administrator shall submit or assure that the permit applicant submits technical or scientific data to FEMA for a Letter of Map Revision (LOMR). 2. All LOMRs for flood control projects are approved prior to the issuance of building permits. Building Permits must not be issued based on Conditional Letters of Map Revision (CLOMRs). Approved CLOMRs allow construction of the proposed flood control project and land preparation as specified in the "start of construction" definition. Such submissions are necessary so that upon confirmation of those physical changes affecting flooding conditions, risk premium rates and floodplain management requirements are based on current data. E. Obtain and maintain for public inspection and make available as needed: 1. The certified elevation required in Section 15.60.160(C)(1); 2. The certification required in Section 15.60.160(C)(2); 3. The certification required in Section 15.60.160(C)(3)(c); 4. The certification required in Section 15.60.160(C)(4)(a) or 15.60.160(C)(4)(b); 5. The certificated elevation required in Section 15.60.180(B); 6. The certification required in Section 15.60.200(A); and 7. The reports required in Section 15.60.210(D). F. Make interpretations where needed, as to the exact location of the boundaries of the areas of special flood hazards, areas of flood-related erosion hazards or areas of mudslide (i.e., mudflow) (for example, where there appears to be a conflict between a mapped boundary and actual field conditions). The person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in the variance procedure portion of this chapter. G. Take action to remedy violations of this chapter as specified in Section 15.60.080 herein. H. Notify FEMA in writing whenever the corporate boundaries have been modified by annexation or other means and include a copy of a map of the community clearly delineating the new corporate limits. PROVISIONS FOR FLOOD HAZARD REDUCTION
( Ord. 10-87 ; Ord. 25-87 ; Ord. 11-20 , 2020 )
Ask a question about Orange law
Corpus searches the Orange sections it holds and shows the ones that match, with their citations. Free, no sign-in.