For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 17.18.160 — Landscaping

Municipal Code, City of Orange, California (through Ord. No. 01-26 adopted January 27, 2026) · Orange Municipal Code § 17.18.160

Corpus is an independent public-information project, not the official City of Orange website. Stable reference: corpuslaw.us/code/79ae14d4-14c8-483d-8fb7-c94f88ac1ce4

§ 17.18.160: Landscaping.

Landscaping shall be provided as specified in Orange Municipal Code Chapter 16.50 (Landscaping Requirements). The following site specific requirements have been reiterated to assist in project design. A. On-Site Area Requirements. 1. Setback Areas. a. Front Property Lines. Landscape the front yards of all buildings facing a street, entire setback area or 10 feet minimum planter width, whichever is greater. b. Interior Side and Rear Property Lines. When a building is not on the property line, a landscape planter a minimum of four feet wide, clear inside dimension, shall be required along all side and rear property lines. Car overhangs shall not be included within the required four feet. If perpendicular parking is used at property lines, the minimum planter width shall be six feet, clear inside dimension, excluding car overhangs. 2. Parking Areas. All parking visible from public streets is required to be screened with five gallon shrubs at three feet on center. Berms of three feet may be used if landscape area is 20 feet wide or greater. 3. Trash Enclosure. A minimum four foot wide landscaped planter, clear inside dimension, shall be provided on at least two sides of all trash enclosures. B. Landscape Material and Size Requirements. 1. On-site Landscaping. a. Trees. Trees are required throughout the project site within all parking areas and along all property lines, including side yards and backyards, where buildings are away from the property line. They need to be located randomly throughout the project site unless determined otherwise through site plan and design review. Larger tree specimens are encouraged to be used along the property's street frontage. i. Size. Twenty-five percent shall be in 24 inch box, and 75% shall be in 15 gallon containers. Larger tree sizes will be required for sites larger than one acre in size; ii. Number. To calculate the quantity of trees required on a project, add together the total length of all the perimeter property lines (all sides), the total length of the perimeter of the buildings, and the total length of all parking rows on the site, and divide by 36. b. Shrubs. Shrubs are encouraged throughout the project site within all parking areas, setbacks and around building footprints. i. Size. All shrubs shall be five gallon, except for plants like Agapanthus, day lilies, and plants used for ground cover, which may be one gallon, or flatted materials; ii. Number. Shrubs at the foundation lines of all buildings and four feet minimum width planters at all elevations seen from the street, shall be planted with five gallon materials at three feet on center. 2. Street Tree Requirements. All street trees will be approved on a project by project basis through the design review process and based upon the City's master street tree list. Appendix (x) contains the specific designated street tree list for the Northwest Specific Plan area. Trees shall be located in compliance with the following Public Works setback requirements: a. 30 feet from property line on corner lots; b. 15 feet from lamp standards; c. 10 feet from fire hydrants and sewer laterals; d. Eight feet from driveways and water meters; e. Five feet from service walks. C. Specifications for Landscaping Plans. The following specifications should be included on landscaping plans submitted for review: 1. All species of plant material to be used, with sizes and quantities. 2. All hardscaping and proposed site ground signage. 3. All existing trees to be removed (indicate species and trunk diameters). Property owners are encouraged to save existing trees whenever possible. 4. Note on plans that a fully automated irrigation system will be provided. Also, note on plans that "applicant is required to verify street tree requirements with the Park Division."

( Ord. 12-95 ; Ord. 21-95 )

Ask a question about Orange law

Corpus searches the Orange sections it holds and shows the ones that match, with their citations. Free, no sign-in.