§ 17.32.050 — Petition for Rezone to SG District—Filing Requirements
Municipal Code, City of Orange, California (through Ord. No. 01-26 adopted January 27, 2026) · Orange Municipal Code § 17.32.050
Corpus is an independent public-information project, not the official City of Orange website. Stable reference: corpuslaw.us/code/80786a6d-e2ce-45ff-8826-ad9762c52344
§ 17.32.050: Petition for Rezone to SG District—Filing Requirements.
Any petition for a zone change that would place property in the SG (Sand and Gravel Extraction) District shall be signed by all holders of easements, lessees and owners of record of all property included within the petitioned area. Any request by the property owner to continue any existing operations permitted by this section that were existing at the time this section became effective shall be accompanied by the following documents, plans, and materials: A. Legal Description. A legal description of the entire property upon which SG zoning is sought. B. Plan of Operations. A general plan of operations, including the following: 1. A plot plan of the entire property drawn to scale and showing contour intervals of not more than five feet, defining the location and showing the perimeter of the area(s) to be excavated. The plot plan shall also show the locations of any existing structures, watercourses, levees, drainage facilities, underground utilities and roads or improvements adjoining the property; 2. A vehicular access plan, which shall be designed in such a manner as to result in a minimum amount of additional vehicular traffic over local residential streets; 3. A topographic map prepared by a registered civil engineer or licensed surveyor or licensed photo-grammetric surveyor and a complete report of a comprehensive soils engineering and engineering geologic investigation prepared by a registered civil engineer and/or registered engineering geologist. The topographic map shall be accompanied by a written report that sets forth probable volume and depth of overburden and nonusable material; 4. A description of the proposed operation during all phases, including a schedule that shows an approximate starting date, increments of extraction and the sequence in which such increments will progress. The plan shall also show approximate future locations of any machinery or processing equipment (excluding vehicles) that would be relocated during the excavation operations. The plan shall also indicate the precise location of any permanent buildings and structures, processing plants or other appurtenant equipment, storage of topsoil and overburden, stockpiles, parking areas, and required setbacks, fencing, berms and screen planting. Where operations include the washing of sand and gravel, the estimated daily quantity of water required, its source and disposition, shall be made a part of this description; 5. A plan showing the location of proposed protective works, settling basins, desilting ponds and other bodies of water, including a description of provisions to be taken for the conservation and protection of groundwater, the disposition of drainage and the control of erosion; 6. A statement of estimated time required to conclude excavation. C. Ultimate Use Proposal. In order to provide assurance that the land will be suitable to serve a useful purpose upon the completion of excavation operations, an ultimate use proposal shall be submitted, to include the following: 1. A topographic map showing the approximate final contours at intervals of not more than five feet. Such map shall be drawn to scale and shall be of sufficient detail to establish that the proposed ultimate use or uses can be accomplished. The map shall also show the location of all structures, drainage facilities and streets that are proposed to remain after the completion of extraction operations. 2. A statement and plan that describes, or illustrates, one or more feasible ultimate uses for the property upon the completion of excavation operations. Such use or uses shall conform to the following requirements: a. The proposed ultimate use or uses shall be physically and economically feasible. b. The proposed ultimate use or uses shall be consistent with the general plan. c. The proposed ultimate use or uses shall be compatible with existing and permitted adjacent uses. 3. Any additional information or evidence that may be helpful in explaining the proposed ultimate use. 4. Any subsequent change in the ultimate use proposal or proposals which affect the ultimate reuse of the site shall be subject to the approval of a conditional use permit by the City Planning Commission. D. Rehabilitation Plan. In order to assure that restoration procedures will commence and continue with excavation operations, a rehabilitation plan shall be submitted to include the following: 1. A preliminary grading plan, showing the property as it will be prepared for the installation or establishment or the proposed ultimate use. 2. A phasing plan that shows how the area will be incrementally restored to a natural condition when excavation operations are completed in one area, and moved to the next area. 3. A statement and plans describing the proposed rehabilitation methods and procedures, including but not limited to the following: a. Landscaping plans to be approved by the Directors of Public Works, Community Development and Community Services. b. Drainage plans and facilities, slope stability and erosion control plans to be approved by the Director of Public Works.
( Prior code 17.50.060, 17.56.060 ; Ord. 54-73 ; Ord. 20-78 ; Ord. 1-80 ; Ord. 12-95 )
Ask a question about Orange law
Corpus searches the Orange sections it holds and shows the ones that match, with their citations. Free, no sign-in.
