§ 8.31.030 — Submission of Waste Management Plan
Municipal Code, City of Orange, California (through Ord. No. 01-26 adopted January 27, 2026) · Orange Municipal Code § 8.31.030
Corpus is an independent public-information project, not the official City of Orange website. Stable reference: corpuslaw.us/code/42d65dc8-c07b-4ec5-ad04-6af3b6798abe
§ 8.31.030: Submission of Waste Management Plan.
A. Applicants for building or demolition permits involving any covered project shall complete and submit a waste management plan ("WMP"), on a WMP form approved by the City for this purpose, as part of the application packet for the building and/or demolition permit. The completed WMP shall indicate all of the following: 1. The estimated weight of project C&D debris, by material type, to be generated; 2. The maximum weight of such materials that can feasibly be diverted via reuse or recycling; 3. The vendor or facility that the applicant proposes to use and receive the material; 4. The estimated weight of C&D debris that will be landfilled; 5. Any special or specific activities that the applicant will use to comply with the provisions of this section; For purposes of this chapter, measurements of weight may be satisfied by measurements of volume, as authorized by Section 8.31.060.B. B. Calculating Weight of Debris. In estimating the weight of materials identified in the WMP, the applicant shall use the standardized conversion rates approved by the City for this purpose. C. Deconstruction. In preparing the WMP, applicants for building or demolition permits involving the removal of all or part of an existing structure shall consider deconstruction, to the maximum extent feasible, and shall make the materials generated thereby available for salvage rather than being landfilled.
( Ord. 13-21 , 2021 )
Ask a question about Orange law
Corpus searches the Orange sections it holds and shows the ones that match, with their citations. Free, no sign-in.
