§ 12.34.050 — Application for communication facility permit
Municipal Code, City of Palmdale, California (Code 2026-05-05) · Palmdale Municipal Code § 12.34.050
Corpus is an independent public-information project, not the official City of Palmdale website. Stable reference: corpuslaw.us/code/1188777d-987a-4140-900f-4d482e8edabf
§ 12.34.050: Application for communication facility permit.
(A) Application. (1) In addition to the information required of an applicant for an encroachment permit or any other permit required by this code, each applicant requesting approval of the installation or modification of a communication facility in the public right-of-way shall fully and completely submit to the City a written application on a form prepared by the Director. (2) No applicant seeking to install wireless antennas shall seek an encroachment permit for fiber or coaxial cable only. Applicants shall simultaneously request fiber installation or other cable installation when seeking to install antennas in the right-of-way. (B) Application Contents – All Permits. The Director shall develop an application form and make it available to applicants upon request. The supplemental application form for any new communication facility installation in the public right-of-way (regardless of whether it is ministerial or discretionary) shall require the following information, in addition to any information required by subsection (C) of this section (for discretionary permits) and all other information determined necessary by the Director: (1) Contact Information. The name, address, email address, and telephone number of the applicant, owner and the operator of the proposed facility, and the date the application was received by the City. (2) Owner Authorization. If the facility will be located on or in the property of someone other than the owner of the facility (such as a street light pole, utility pole, utility cabinet, vault, or cable conduit), the applicant shall provide a duly executed written authorization from the property owner(s) authorizing the placement of the facility on or in the property owner's property. (3) Engineering Plans. Detailed engineering plans of the proposed facility and related report prepared by a professional engineer registered in the State documenting the following: (a) Height, diameter and design of the facility, including technical engineering specifications, economic and other pertinent factors governing selection of the proposed design, together with evidence that demonstrates that the proposed facility has been designed to be the least visible equipment within the particular technology the carrier chooses to deploy. A layout plan, section and elevation of the tower structure shall be included. (b) A photograph and model name and number of each piece of equipment included. (c) Power output and operating frequency for the proposed antenna. (d) Total anticipated capacity of the structure, indicating the number and types of antennas and power and frequency ranges which can be accommodated. (e) Sufficient evidence of the structural integrity of the pole or other supporting structure as required by the City. (4) Justification for Facility. Unless the Director waives the requirement, a study which provides all relevant evidence of whether a denial of the proposed facility would materially inhibit the applicant's provision of personal wireless services in violation of Federal law. (5) Environmental. A completed environmental assessment application. (6) Request for Exception. If the applicant requests an exception to the requirements of this chapter (in accordance with PMC § 12.34.190, Exceptions), the applicant shall provide all information and studies necessary for the City to evaluate that request. (7) Proof of RF Emission Compliance. For a facility that is not categorically excluded under the FCC regulations for RF emissions, the applicant shall submit an RF exposure compliance report prepared and certified by an RF engineer acceptable to the City that certifies that the proposed facility, as well as any facilities that contribute to the cumulative exposure in the subject area, will comply with applicable Federal RF exposure standards and exposure limits. The RF report must include the actual frequency and power levels (in watts effective radio power "ERP") for all existing and proposed antennas at the site and exhibits that show the location and orientation of all transmitting antennas and the boundaries of areas with RF exposures in excess of the uncontrolled/general population limit (as that term is defined by the FCC) and also the boundaries of areas with RF exposures in excess of the controlled/occupational limit (as that term is defined by the FCC). Each such boundary shall be clearly marked and identified for every transmitting antenna at the project site. (8) FAA Documents. Copies of any documents that the applicant is required to file pursuant to Federal Aviation Administration regulations for the facility. (9) Fee. An application fee, and a deposit for a consultant's review as set forth in subsection (F) of this section in an amount set by resolution by the City Council and in accordance with applicable law (e.g., California Government Code Section 50030). (10) RF Exposure Checklist. Completion of the radio frequency (RF) emissions exposure guidelines checklist contained in Appendix A to the Federal Communications Commission's (FCC) "Local Government Official's Guide to Transmitting Antenna RF Emission Safety," as it may be amended from time to time, to determine whether the facility will be "categorically excluded" as that term is used by the FCC. (11) Site Plans. Site plan(s) to scale, specifying and depicting the exact proposed location of the pole, pole diameter, antennas, accessory equipment, access or utility easements, landscaped areas, existing utilities, adjacent land uses, and showing compliance with PMC § 12.34.070, Design and development standards. (12) Traffic Control. If an encroachment permit is required, then the encroachment permit procedures shall control whether (or not) a traffic control plan is required. If no encroachment permit is required, then a traffic control plan is required if either (a) the proposed installation is on any street in a nonresidential zone or (b) the applicant seeks to use large equipment (e.g., crane) and the Director decides to require a traffic control plan. (13) Other Information. Any other information and/or studies determined necessary by the Director may be required. (C) Additional Application Contents – Discretionary Permits. In addition to providing all materials required in subsection (B) of this section, applications for discretionary permits shall also provide the following: (1) Owner Authorization. If the applicant is an agent, the applicant shall provide a duly executed letter of authorization from the owner of the facility. If the owner will not directly provide wireless telecommunications services, the applicant shall provide a duly executed letter of authorization from the person(s) or entity(ies) that will provide those services. (2) Written Description. A full written description of the proposed facility and its purpose. (3) Mock-Up and Sign. Proof that a temporary mock-up of the facility and sign have been installed at the proposed location for a period of at least 30 calendar days which facility roughly replicates for the public the proposed height and bulk of the proposed structure. If the Director finds the applicant's cost of complying with this requirement would greatly outweigh the value of such compliance, then the Director may waive the requirement that the applicant install the mock-up (but not the installation of the sign, which still requires an encroachment permit). (a) Applicant shall obtain an encroachment permit before installing a temporary mock-up and a sign, and must remove the temporary mock-up and sign within five calendar days of receiving a written notice to remove from the Director. (b) The mock-up and sign shall demonstrate the height and mass of the facility, including all interconnecting cables. The applicant shall not be entitled to install the facility it intends to install permanently. The mock-up may consist of story poles or the like. (c) The mock-up shall be accompanied by a sign that displays photo simulations depicting before and after images, including any accessory equipment cabinet, and the telephone number of the Public Works Department. (d) The applicant shall be required to follow any other City practices or processes relevant to the installation of a mock-up and sign as may be provided in a publicly accessible form or document. (e) After installation of the mock-up, the applicant shall certify that the mock-up accurately represents the height and width of the proposed installation and has been installed consistent with this code. (4) Elevations. Scaled elevation plans of proposed poles, antennas, accessory equipment, and related landscaping, and camouflage. (5) Noise Study. A noise study prepared by a qualified acoustic engineer documenting that the level of noise to be emitted by the proposed communication facility will comply with this code, including PMC § 12.34.070(O)(2). The Director may waive the requirement for a noise study if the Director finds the cost of creating the study would greatly outweigh the value of receipt of such study. (6) Propagation Maps. Upon written request of the applicant, the Director at his or her discretion may waive some or all of the following: a written description identifying the geographic service area for the subject installation including geographic and propagation maps, that identifies the location of the proposed facility in relation to all existing and planned facilities maintained within the City by each of the applicant, operator, and owner, if different entities, as well as the estimated number of potentially affected uses in the geographic service area. Regardless of whether a master deployment plan permit is sought, the applicant shall depict all locations anticipated for new construction and/or modifications to existing facilities, including collocation, within two years of submittal of the application. Longer range conceptual plans for a period of five years shall also be provided, if available. (a) In the event the applicant seeks to install a communication facility to address service coverage concerns, full-color signal propagation maps with objective units of signal strength measurement that show the applicant's current service coverage levels from all adjacent sites without the proposed site, predicted service coverage levels from all adjacent sites with the proposed site, and predicted service coverage levels from the proposed site without all adjacent sites. (b) If applicant seeks to address service capacity concerns, a written explanation identifying the existing facilities with service capacity issues together with competent evidence to demonstrate the inability of those facilities to meet capacity demands. (7) CPCN. Certification that applicant is a telephone corporation or a statement providing the basis for its claimed right to enter the right-of-way. If the applicant has a certificate of public convenience and necessity (CPCN) issued by the California Public Utilities Commission, it shall provide a copy of its CPCN. (8) Visual Depiction. Accurate visual impact analysis showing the maximum silhouette, color and finish palette and proposed camouflage for the facility, including scaled photo simulations from at least three different angles. (D) Application Contents – Modification of Existing Facility. The content of the application form for a modification to an existing facility shall be determined by the Director, and shall include but not be limited to the requirements listed in subsections (B) and (C) of this section unless prohibited by State or Federal law. (E) Effect of State or Federal Law Change. If a subsequent State or Federal law prohibits the collection of any information required by subsection (B) or (C) of this section, the Director is authorized to omit, modify or add to that request from the City's application form with the written approval of the City Attorney, which approval shall be a public record. (F) Independent Expert. The Director is authorized to retain on behalf of the City an independent, qualified consultant to review any application for a permit for a communication facility. The review is intended to be a review of technical aspects of the proposed communication facility and shall address any or all of the following: (1) Compliance with applicable radio frequency emission standards; (2) Whether any requested exception is necessary to close a significant gap in coverage and is the least intrusive means of doing so; (3) The accuracy and completeness of submissions; (4) Technical demonstration of the unavailability of alternative sites or configurations and/or coverage analysis; (5) The applicability of analysis techniques and methodologies; (6) The validity of conclusions reached or claims made by applicant; (7) The viability of alternative sites and alternative designs; and (8) Any other specific technical issues identified by the consultant or designated by the City. The cost of this review shall be paid by the applicant through a deposit pursuant to an adopted fee schedule resolution. No permit shall be issued to any applicant which has not fully reimbursed the City for the consultant's cost.
( Ord. 1603 § 4 (Exh. IB), 2023 )
Ask a question about Palmdale law
Corpus searches the Palmdale sections it holds and shows the ones that match, with their citations. Free, no sign-in.