For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 17.95.020 — Permits required

Municipal Code, City of Palmdale, California (Code 2026-05-05) · Palmdale Municipal Code § 17.95.020

Corpus is an independent public-information project, not the official City of Palmdale website. Stable reference: corpuslaw.us/code/ab94a749-1847-4313-a46d-e0bba725fa39

§ 17.95.020: Permits required.

(A) Communication/wireless telecommunication facilities are subject to review in all residential, commercial, industrial, and special purpose zones according to the permissions tables in Divisions 3 through 7 of this Title. (B) General Rule – Conditional Use Permit Required. Unless otherwise provided in this Title, all new wireless facilities, except for small cells, collocations, or modifications to existing wireless facilities, shall require a conditional use permit. (1) The Review Authority may refer a conditional use permit to the City Council for approval. (2) The Review Authority shall approve a conditional use permit if all of the following apply: (a) The facility will comply with all applicable laws including, but not limited to: (i) The Americans with Disabilities Act; (ii) All building and safety requirements, including those within the California Building Standards Code, as amended by the City and the latest version of TIA ANSI 222, to the extent that such standards are more restrictive than the otherwise applicable requirements; (iii) All applicable current requirements of the FCC and OSHA (Occupational Safety and Health Administration), including requirements relating to radiofrequency (RF) emissions and limits on interference; (iv) The requirements of this Chapter; (v) Either the City has issued all required encroachment permits or it is a condition of the issuance of the permit that no installation begin in reliance on the permit until the City has issued all required encroachment permits. (3) A facility that obtains an administrative permit as allowed within the permissions tables specified within Division 3 through 7 of this Title need not obtain a conditional use permit. (C) Administrative Permit. (1) The Director shall approve an administrative permit pursuant to PMC § 17.26.040 (Minor modifications to approved plans) if it is in compliance with PMC § 17.95.030 (Development standards) and if all of the following apply: (a) The application is for: (i) Small wireless facility; or (ii) A collocation or modification of wireless telecommunication equipment on an existing eligible facility which does not create a substantial modification. (b) The facility will comply with all applicable laws including, but not limited to: (i) The Americans with Disabilities Act; (ii) All building and safety requirements, including those within the California Building Standards Code, as amended by the City, and the latest version of TIA ANSI 222, to the extent that such standards are more restrictive than the otherwise applicable requirements; (iii) All applicable requirements of the FCC and OSHA including requirements relating to RF emissions and limits on interference; and (iv) The requirements of this Chapter. (2) The proposed facility will be installed on an existing support structure that meets all of the following requirements: (a) The facility will match the design of the pole; and (b) If feasible, all equipment installed on the pole will be the same color as the pole. (D) Batched Application. An applicant, or its agent of record, may submit applications for multiple small wireless facilities or locations with the following conditions that are intended in order to assure compliance with the FCC's "Shot Clock" requirements: (1) No single batched submittal shall contain more than five applications; (2) There must be a minimum of seven business days between submittals of batched applications; and (3) No more than four batched applications shall be accepted in any 30-consecutive-day period. (E) Other Permits Required. In addition to any permit that may be required under this Chapter, the applicant must obtain all other required prior permits or other approvals from other City departments, or State or Federal agencies. Any permit granted under this Chapter shall be subject to the conditions and/or requirements of other required permits or other approvals from other City departments, State, or Federal agencies. (F) Speculative Equipment Prohibited. The City shall not approve any equipment or other improvements in connection with a wireless telecommunications facility approval when the applicant does not actually and presently intend to install such equipment or construct such improvements within 180 days. (G) Any application for eligible facilities which does not include a substantial modification request shall be approved administratively pursuant to PMC § 17.26.040 (Minor modifications to approved plans) if it is in compliance with PMC § 17.95.030. In cases of collocation, an applicant may, at their discretion, choose to pursue a new conditional use permit pursuant to PMC Chapter 17.22 (Conditional Use Permits) in order to separate insurance and liability requirements and have individualized conditions of approval. This new conditional use permit shall, however, not extend the life of the original conditional use permit for the initial facility or pole structure. (H) Supplemental Information. (1) Permit applications for all communication/wireless telecommunication facilities shall be accompanied by the following supplemental materials, unless waived by the Director: (a) A preliminary report that quantifies the project's electromagnetic frequency (EMF) radiation exposures and power levels, and compares them with adopted standards; (b) A plan for the ongoing security and inspection of the facility as applicable, which may include but not be limited to provisions for fencing, anti-climbing devices, elevated ladders on towers, and monitoring, to prevent unauthorized access and vandalism; (c) An alternative site analysis to mitigate visual, land use, or environmental impacts, if required; (d) A facilities propagation map to ensure that maximum utilization and efficient use of limited communications sites will be achieved. Such a map shall be at a scale no smaller than one inch equals one-half mile and shall include the corporate boundaries of the City and the City's sphere of influence; and (e) For a proposed facility within the area affected by the Air Installation Compatible Use Zone (AICUZ), a report demonstrating compliance with Joint Land Use Committee Policies, including siting and electronic signal interference considerations, and compliance with FAA Regulation 77 (Height and Obstruction Criteria).

( Ord. 1603 § 4 (Exh. I), 2023 )

Ask a question about Palmdale law

Corpus searches the Palmdale sections it holds and shows the ones that match, with their citations. Free, no sign-in.