§ 17.99.030 — Solar energy system (primary)

Municipal Code, City of Palmdale, California (Code 2026-05-05) · Palmdale Municipal Code § 17.99.030

Corpus is an independent public-information project, not the official City of Palmdale website. Stable reference: corpuslaw.us/code/c537ad3e-6133-4bb3-9652-f45dc0549ec0

§ 17.99.030: Solar energy system (primary).

(A) Purpose and Intent. It is the intent of these standards to allow utility-scale solar energy system facilities as a primary use pursuant to the permissions tables specified within Divisions 3 through 7 of this Title. It is the purpose of these standards to ensure that alternative energy systems are available in the City, and that they are sited and installed in a manner that avoids hazards to the public health and safety while minimizing adverse aesthetic impacts to the maximum extent possible. (B) Supplemental Information Required. Permit application for all utility-scale solar energy system facilities shall be accompanied by the following supplemental materials, unless waived by the Review Authority: (1) A plan for the ongoing security and inspection of the facility as applicable, which may include but is not limited to provisions for fencing, anticlimb devices, and monitoring, to prevent unauthorized access and vandalism; and (2) A plan for permanent dust control of the site. (C) Development Standards. In addition to compliance with all other applicable statutes, ordinances, standards and policies, the following standards shall apply to all utility-scale solar energy system facilities as allowed pursuant to this Chapter: (1) Setbacks. (a) Setbacks shall be those specified for primary structures within the respective zone; (b) Solar support structures shall not be allowed in any front or street side setback; (c) No minimum landscape setback along any public or private street frontage shall be required; (d) No transition zone setback pursuant to PMC § 17.83.030(A) shall be required; (e) Transition zone landscaping shall be required pursuant to PMC § 17.83.030(C); and (f) Where transition zone landscaping is required pursuant to PMC § 17.83.030(C), the number and types of trees required may be modified at the discretion of the Director and the City Engineer where there is the potential for shading of solar panels. (2) Height. The maximum height of any structure shall be that as specified for the primary structure within the respective zone. (3) Glare. Solar panels shall be placed such that concentrated solar radiation or glare is not directed onto nearby properties, including U.S. Air Force Plant 42, other airport related, or roadways. (4) Security Fencing. Utility-scale solar energy system facilities shall be enclosed by an eight-foot-high fence for security purposes. Vinyl-coated chain link or wrought iron fencing may be allowed by the Review Authority based upon a finding that no adverse visual or aesthetic impacts will occur, and the material is compatible with the surrounding area. This determination shall be made as part of the project review process. Under no circumstances shall razor, barbed, concertina wire, or electrified fencing be allowed. (5) Lighting. Security lighting shall be consistent with the standards of PMC § 17.86.030 (Outdoor lighting), including shielding from adjacent properties, requiring lighting to be directed downward with full cut-off features to reduce light pollution. (6) Signage. One project identification sign, located at each point of project ingress and egress, not to exceed 50 square feet in area and five feet in height, may be erected on the project site. No other signs shall be installed other than required safety and warning signs. (7) Conformance with PMC Chapter 12.04 (Underground Utilities). All utility-scale solar energy system facilities, including any new off-site transmission lines, are subject to the provisions of PMC Chapter 12.04 (Underground Utilities), pertaining to underground utilities and encroachment into public rights-of-way. (D) Operational Standards. (1) Time Limits. The maximum duration of the approval period for a utility-scale solar energy system facility shall be 25 years. An extension of the approval may be granted by the Review Authority. New conditions of approval may also be applied to an approval for extension, as may be deemed necessary based upon changing conditions or development in the surrounding area. (2) Discontinued Use. The operator of a lawfully erected facility, and the owner of the property upon which it is located, shall promptly notify the Director in writing in the event that use of the facility is discontinued for any reason. In the event that the discontinued use is permanent, the owner(s) and/or operator(s) shall promptly remove the facility and repair any damage to the property caused by such removal, including revegetation and road repair. All such removal and repair shall be completed within 90 days after the use is discontinued and shall be performed pursuant to all applicable zoning and health and safety code standards. For purposes of this Subsection, a discontinued use shall be permanent unless the facility is reasonably likely to be operative and used within the immediately following three-month period. (3) Abandonment. Structures associated with solar energy system facilities that have been determined to be inoperative or abandoned for a period of six months shall be removed, unless a new application to reestablish the use is filed with the City. (4) Removal by City. The City may remove an abandoned facility, repair any and all damage to the property caused by such removal, and otherwise restore the property as is appropriate pursuant to the applicable code at the following times: (a) After 30 days following a notice of abandonment; or (b) Following a notice of decision by the Director, subject to the owner/operator's right of appeal pursuant to this Title. The City may, but shall not be required to, store the removed facility (or any part thereof). The owner of the premises upon which the abandoned facility was located, and all prior operators of the facility, shall be jointly liable for the entire cost of such removal, repair, restoration, and storage, and shall remit payment to the City promptly after demand therefor is made. The City may, in lieu of storing the removed facility, convert it to the City's use, sell it, or dispose of it in any manner deemed by the City to be appropriate. (5) City Lien on Property. When the City removes an abandoned facility pursuant to Subsection (D)(4) of this Section, the cost for the removal, repair and restoration of the site, and storage of the materials shall be recouped through the placement of a lien on the real property on which the facility was located, for the full amount of the cost of removal, repair, restoration, and storage. The Director shall cause the lien to be recorded in the County of Los Angeles Recorder's Office.

( Ord. 1603 § 4 (Exh. I), 2023 )