14.03.110 - Inspections.

A. General: Construction or work for which a permit is required shall be subject to inspection by the building official and the construction or work shall remain accessible and exposed for inspection purposes until approved by the building official. In addition, certain types of construction shall have continuous inspection as specified in this section. Approval as a result of an inspection shall not be construed to be an approval of a violation of the provisions of this code or of other ordinances or laws. Inspections presuming to give authority to violate or cancel the provisions of this code or of other ordinances of the jurisdiction shall not be valid. It shall be the duty of the permit applicant to cause the work to remain accessible and exposed for inspection purposes. Neither the building official nor this jurisdiction shall be liable for expense entailed in the removal or replacement of any material required to allow inspection. B. A survey of the lot may be required by the building official to verify that the structure is located in accordance with the approved plans. Neither the building official nor the city shall be liable for expense entailed in the removal or replacement of any material required to allow inspection. C. For all new construction and when required by the city, a licensed surveyor must certify that the height of the building is in accordance with the approved plans. The surveyor must show the precise height of the building as compared with the reference elevation shown on the approved plans. D. Approved Fabricators: Special inspections required by this section and elsewhere in this code or the technical codes shall not be required where the work is done on the premises of a fabricator registered and approved by the building official to perform such work without special inspection. The certificate of registration shall be subject to revocation by the building official if it is found that work done pursuant to the approval is in violation of the technical codes. The approved fabricator shall submit a certificate of compliance to the building official and to the engineer or architect of record stating that the work was performed in accordance with the approved plans and specifications. The approved fabricator's qualifications shall be contingent on compliance with the following: 1. The fabricator has developed and submitted a detailed fabrication procedural manual reflecting key quality control procedures which will provide a basis for inspection control of workmanship and the fabricator plant. 2. Verification of the fabricator's quality control capabilities, plant and personnel as outlined in the fabrication procedural manual shall be by an approved inspection or quality control agency. 3. Periodic plant inspections shall be conducted by an approved inspection or quality control agency to monitor the effectiveness of the quality control program. 4. It shall be the responsibility of the inspection or quality control agency to notify the approving authority in writing of any change to the procedural manual. Fabricator approval may be revoked for just cause. Reapproval of the fabricator shall be contingent on compliance with quality control procedures during the past year. E. Structural Observation: Structural observation shall be provided in seismic design category D, E, or F as indicated in the building code. F. Inspection Record: Work requiring a permit shall not be commenced until the permit holder or the agent of the permit holder shall have posted in a conspicuous place at the construction site a permit and inspection record such as to allow the building official conveniently to make the required entries regarding inspection of the work. The permit shall be posted in a location such that it is visible from the street. The permit, construction documents, and plans shall remain readily available on site until final approval has been granted by the building official. The requirements for posting and location of posting may be waived or modified by the building official as deemed necessary for the particular type of work. G. Duplicate inspection cards may be issued upon payment of fees as established by city council resolution. H. Inspection Requests: It shall be the duty of the person doing the work authorized by a permit to notify the building official that such work is ready for inspection. Failure to do so constitutes a violation of this administrative code. The building official may require that every request for inspection be filed at least one business day before such inspection is desired. Such requests shall be made in a manner deemed acceptable by the building official. It shall be the duty of the person requesting any inspections required by this code to provide access to and means for inspection of the work. Failure of a permit holder to schedule and undergo all required progress, final or other inspections by the division is a violation of this administrative code. I. Approval Required: Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the building official. The building official, upon notification, shall make the requested inspection and shall either indicate that that portion of the construction is satisfactory as completed (which is referred to as a "successful inspection") or shall notify the permit holder or an agent of the permit holder wherein the same fails to comply with this code. Any portion of work that does not comply with the code shall be corrected and such portion shall not be covered or concealed until authorized by the building official. All work and installations that are authorized by a permit shall not become lawful until a permit holder has obtained a final inspection approval from the division, which shall be in writing. There shall be a final inspection and approval of all buildings and structures when completed and ready for occupancy and use. J. Reinspections: A reinspection fee may be assessed for each inspection or reinspection when such portion of work for which inspection is called is not complete or when corrections called for are not made. This section is not to be interpreted as requiring reinspection fees the first time a job is rejected for failure to comply with the requirements of this code, but as controlling the practice of calling for inspections before the job is ready for such inspection or reinspection. Reinspection fees may be assessed when the inspection record card is not posted or otherwise available on the work site, the approved plans are not readily available to the inspector, for failure to provide access on the date for which inspection is requested, or for deviating from plans requiring the approval of the building official. To obtain a reinspection, the applicant shall file an application therefor in writing upon a form furnished for that purpose, and pay the reinspection fee in accordance with the fee schedule adopted by this jurisdiction. In instances where reinspection fees have been assessed, additional inspection of the work will not be performed until the required fees have been paid.

(Ord. No. 7461, § 4, 11-10-2025)