For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 62-323 — Subdivision development

Pomona City Code, California (Supp. No. 32: codified through Ordinance No. 4371, adopted June 2, 2026) · Pomona City Code § 62-323

Corpus is an independent public-information project, not the official City of Pomona website. Stable reference: corpuslaw.us/code/f3e049d4-2cfc-4695-b90a-a8a3bf54a044

Sec. 62-323. - Subdivision development.

(a) A developer applying for service to a subdivision development shall submit a tentative map or sketch of his proposed improvements. The utility services department will then prepare an estimate indicating the water facilities required, including service connections and their estimated cost. The estimate will include an amount for a cash deposit for the department's costs of inspection, disinfection, compaction tests and other work where required. Construction plans shall be prepared by a registered engineer and submitted to the utility services department for approval. The facilities shall be installed under the department's inspection, which will be provided only after a cash deposit is made and all other city permits and conditions have been fulfilled. The selected contractor shall be a qualified class A contractor. The utility services department will file a notice of completion after all work is completed. The notice of completion will not be filed until the utility services department manager is satisfied that the following conditions were met: (1) Valve boxes are set flush with the finished pavement. (2) Meter boxes are set to the finished grade. (3) Bond requirements are completed. (4) Required right-of-way is granted to the city. The developer shall have an engineer or title company submit the easement description for preparation of the easement document the by city. (5) As-built plans are submitted. (b) Prior to commencing work, the developer shall deposit in cash the amount of estimated utility services department charges and post a performance bond on a form approved by the utility services department for the balance. The amounts will be noted on the water main estimate. An assignment of an account in an approved bank or savings and loan association on an approved form can be accepted in lieu of the bond requirement. Twenty-five percent of the bond or the cash assignment shall remain in effect for one year after the notice of completion is filed to guarantee the water facilities against leaks, breaks, faulty materials or workmanship and against settlement of backfill and damage to surfacing. Only by such financial arrangements would the city sign a subdivision title sheet and provide letters stating financial requirements have been completed to provide water. (c) All meters will be installed by the utility services department in accordance with the requirements of sections 62-241 through 62-245. (d) If all or part of a subdivision development is adjacent to an existing water main, all connections to be installed to those lots adjacent to existing water mains shall be in accordance with the requirements of sections 62-321 and 62-322. All other lots shall be in accordance with this section. (e) When, at the discretion of the utility services department, a water main size must be increased to greater than ten inches in diameter, the utility services department will reimburse the developer at the per-foot rate set by resolution of the city council. The utility services department will reimburse the developer, in cash, within three years after the notice of completion for oversized main requirements.

(Code 1959, § 34-51.1; Ord. No. 2832, § 2 (part); Ord. No. 3132, § 3 (part))

Ask a question about Pomona law

Corpus searches the Pomona sections it holds and shows the ones that match, with their citations. Free, no sign-in.