§ 17.109.050: Decommissioning plan.
All applications shall include a decommissioning plan. The decommissioning plan shall include the following: A. A narrative description of the activities to be accomplished, including who will perform that activity and at what point in time, for complete physical removal of all battery energy storage facility components, structures, equipment, security barriers, and transmission lines from the site. B. Disposal of all solid and hazardous waste in accordance with local, state, and federal waste disposal regulations. C. The anticipated life of the battery energy storage facility. D. The estimated decommissioning costs and how the estimate was determined. E. The method of ensuring that funds will be available for decommissioning and restoration. F. The manner in which the site will be restored, including a description of how any changes to the surrounding areas and other systems adjacent to the battery energy storage facility, such as structural elements, means of egress, and required fire detection suppression systems, will be protected during decommissioning and confirmed as being acceptable after the facility is removed. G. A listing of any contingencies for removing an intact operational battery energy storage system unit(s) from service, and for removing a battery energy storage system(s) unit from service that has been damaged by a fire or other event. H. The owner and/or operator of the battery energy storage facility shall implement the decommissioning plan upon abandonment and/or in conjunction with removal of the facility. I. The owner and/or operator of the battery energy storage facility shall continuously maintain a fund payable to the city, in a form and amount approved by the city for the removal of the battery energy storage facility, for the period of the life of the facility. All costs shall be borne by the applicant.
( Ord. No. 1031 , 10/15/2024 )
Ask a question about Rancho Cucamonga law
Corpus searches the Rancho Cucamonga sections it holds and shows the ones that match, with their citations. Free, no sign-in.