§ 8.19.030: Construction and demolition diversion requirements.

A. All construction and demolition projects are required to divert a minimum of 65% of the tonnage generated as a result of the project from the landfill. Separate calculations and reports will be required for the demolition and for the construction portion of projects involving both demolition and construction. B. Every structure planned for demolition shall be made available for deconstruction, salvage and recovery prior to demolition. It shall be the responsibility of the owner, the general contractor and all subcontractors to recover the maximum feasible amount of salvageable designated recyclable and reusable materials prior to demolition. Recovered and salvaged designated recyclable and reusable materials from the deconstruction phase shall qualify to be counted in meeting the diversion requirements of this chapter. Recovered or salvaged materials may be given or sold on the premises, or may be removed to reuse warehouse facilities for storage or sale.

( Ord. No. 941 § 2, 2018 )