15.05.060 - Permit review and inspection requirements.
A. The building official shall implement an administrative, nondiscretionary review process to expedite approval of small residential rooftop solar energy systems. This review process will be able to be submitted electronically to the city or a designated plan review consultant, after approved, the applicant will need to print the hard copy with the approval stamp and present those to the City of Rialto Building Department. The building and safety division shall issue a building permit, the issuance of which is nondiscretionary, within a timely manner. The building official may require an applicant to apply for an administrative use permit if the building official finds, based on substantial evidence, that the rooftop solar energy system could have a specific, adverse impact upon the public health and safety. B. Review of the application shall be limited to the building official's review of whether the application meets local, state, and federal health and safety requirements. C. If an administrative use permit is required, the city may deny such application if it makes written findings based upon substantive evidence in the record that the proposed installation would have a specific adverse impact upon public health or safety and there is no feasible method to satisfactorily mitigate or avoid, as defined, the adverse impact. Such decisions may be appealed to the city planning commission. D. Any condition imposed on an applicant shall be designed to mitigate the specific, adverse impact upon health and safety at the lowest possible cost. E. If an application is deemed incomplete, a written corrections notice detailing all deficiencies in the application and any additional information or documentation required to be eligible for expedited permit issuance shall be sent to the applicant for resubmission. F. Only one inspection shall be required and performed by the building and safety division for small residential rooftop solar energy systems eligible for expedited review. G. Rooftop solar energy system inspection shall be performed in a timely manner after twenty-four hours' notice and should include consolidated inspections. The time frame for inspections called into the city during business hours will be made on next business day. If the next business day is not available due to a large amount of calls or staffing, inspection will be performed the next day or within five business days. The inspector shall make every attempt to notify the applicant of the time the inspection will be performed within a three-hour window by a phone call or email communication. H. If a small residential rooftop solar energy system fails inspection or is not ready for inspection, a subsequent inspection is authorized. A re-inspection fee may be assessed to an applicant if the solar project was not ready for the scheduled inspection.
(Ord. No. 1562, § 2, 9-22-15)
Ask a question about Rialto law
Corpus searches the Rialto sections it holds and shows the ones that match, with their citations. Free, no sign-in.