§ 14.12.445 — Industrial user permits
Riverside Municipal Code (Supp. No. 33: codified through Ordinance No. 7776, enacted June 23, 2026) · Riverside Municipal Code § 14.12.445
Corpus is an independent public-information project, not the official City of Riverside website. Stable reference: corpuslaw.us/code/5377d621-50ab-4192-a00f-5c94a7be432d
14.12.445 - Industrial user permits.
A. It is unlawful for any industrial user to connect or discharge to the POTW without a valid Class I, II, III, IV, V, or VI industrial user permit, WDAC, or Industrial User Group Permit, as determined by the Director. Issuance of any such permit or WDAC shall not vest any right in a user to continue connection or discharge to the POTW beyond the express terms of the permit or WDAC. B. Plans and building permits for Class I, II, III, IV, V, or VI industrial user permits and those users designated by the director shall not be approved by the Director for any sewer connection which will convey industrial wastewater to the POTW unless the user has first obtained an industrial user permit, WDAC, or other written permission from the Director. C. Users required to obtain an industrial user permit shall complete and file with the Director a permit application form provided by the Director and shall pay all applicable fees within 30 days of invoicing by the City. The application form may require applicant's submission of any or all of the following: 1. Name, address, and location (if different from the site address); 2. Standard Industrial Codes (SIC) and NAICS numbers under the Federal North American Industry Classification System, Office of Management and Budget, 1997, as amended; 3. EPA hazardous waste generator's number; 4. Wastewater samples analyzed for specified pollutants by a State certified laboratory in accordance with the methods published by EPA in 40 CFR Part 136 and amendments thereto; 5. Time and duration of the wastewater discharges; 6. Average and maximum daily wastewater flow rates, including any seasonal variation of all waste streams discharged; 7. A list of all environmental control permits held; 8. A written statement from the property owner or landlord, if different from the industrial user, agreeing to the industrial user's activities, manufacturing processes, and chemical and material storage; 9. Site plans, floor plans, mechanical and plumbing plans with details to show all sewers, sewer connections, pretreatment equipment, systems and devices, production areas and all areas of wastewater generation; 10. A description of operations including the nature, average rate of production, and NAICS code of the operation(s) carried out by the industrial user, and a schematic process diagram that indicates points of discharge to the POTW; 11. Flow measurement information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from regulated process waste streams and other waste streams as necessary to allow use of the combined waste stream formula; 12. Measurement of pollutants identifying the National Categorical Pretreatment Standard applicable to each regulated process, with the results of sample analyses identifying the nature and concentration (or mass where required) of regulated pollutants in the discharge from each regulated process. Both daily maximum and average concentration or daily maximum and average mass shall be reported. All analyses shall be performed in accordance with the techniques prescribed in 40 CFR Part 136; 13. Certification statement, as set forth in 40 CFR Part 403.6(a)(2)(ii), executed by an authorized representative of the industrial user and prepared by a qualified professional, indicating whether or not pretreatment standards (categorical and local) are being met on a consistent basis. If not, the industrial user shall state if additional operation and maintenance or additional pretreatment equipment is necessary to achieve compliance with pretreatment standards and requirements; 14. Best management practices necessary to comply with this chapter; and 15. Any other information as may be necessary for the Director to evaluate the permit application. D. Within 45 days after receiving the completed application and all required supporting information, the Director shall evaluate the application and information furnished by the applicant. The Director shall issue the permit, if the Director believes that sufficient and accurate information has been provided by the applicant in the permit application and the Director finds that all of the following conditions are met: 1. The proposed discharge of the applicant is in compliance with the prohibitions and limitations of this chapter; 2. The proposed operation and discharge of the applicant would not interfere with the normal and efficient operation of the POTW; 3. The proposed discharge, operation or business activity of the applicant shall not result in a violation by the City of the terms and conditions of its NPDES permit or cause a pass through of any toxic materials to the environment or the POTW sludge; and 4. The applicant has paid all applicable industrial user permit fees. E. The Director may suspend the permit application process if the user's business will not be operational and no wastewater is planned for discharge at the conclusion of the application review process. The user must notify the Director at least 14 calendar days before starting business activities and wastewater discharge. F. If the Director determines that the proposed discharge will not be acceptable, the Director shall disapprove the application and shall notify the applicant in writing, specifying the reason(s) for denial and the applicable appeals process under Section 14.12.570, Appeals. G. Industrial user permits shall be subject to all provisions of this Chapter and all other applicable regulations, charges and fees established by the City Council of the City of Riverside or the Riverside County Board of Supervisors resolution. Permits may include one or more of the following: 1. The unit charge or schedule of user charges and fees for the wastewater discharged to the POTW as established by ordinance or resolution; 2. Schedule of penalties for noncompliance as established by resolution; 3. Limitations on the average monthly and maximum daily wastewater pollutants and mass emission rates for pollutants; 4. Limitations on the average monthly and maximum daily wastewater flow rates; 5. Requirements for the submittal of a facility waste management plan; 6. Requirements for the submittal of daily, monthly, annual and long-term production rates; 7. Requirements for reporting changes and/or modifications to equipment and/or processes that affect the quantity or quality of the wastewater discharged; 8. Requirements for installation and maintenance of monitoring and sampling equipment and devices; 9. Requirements for the installation of pretreatment technology, pollution control, or construction of appropriate spill containment devices; 10. Requirements to comply with best management practices and periodic written documentation that the best management practices are being implemented and the effects on compliance; 11. Specifications for monitoring programs which may include: sampling location(s); frequency of sampling; pollutant violation notification and resampling requirements; number, types and standards for tests; reporting schedules; TTO monitoring; and self-monitoring standard operating procedures (SOPs); 12. Requirements for reporting flow exceedances and pollutant violations; 13. Consent to the City's entry onto the user's premises to assess compliance by inspection, photography, electronic image recording, records examination, sampling, and monitoring; 14. Compliance schedules. Compliance schedule progress reports, as required, shall be submitted every 30 days during the time the compliance schedule is in force, including a final compliance report at the conclusion of the compliance schedule. The industrial user shall state whether or not compliance was achieved for the increment of progress to be met on such a date. If progress cannot be achieved, the industrial user shall state the reasons for the delay and the steps to be taken to return to the dates originally established in the compliance schedule; 15. Modified compliance schedules if pretreatment standards compliance cannot be met on a consistent basis. A modified compliance schedule shall provide the shortest possible time for the industrial user to provide additional pretreatment and/or operations and maintenance to achieve compliance, and may contain milestones; 16. Requirements for submission of technical or discharge reports, Baseline Monitoring Reports (BMR), compliance reports, and reports on continued compliance; 17. Requirements for submission of a slug discharge plan according to 40 CFR 403.8(f)(1)(iii)(B)(6) and any subsequent updates; 18. Reports on compliance with federal categorical pretreatment standards deadlines. All categorical industrial users shall submit reports to the Director containing the information described in this section as required by the permit. For existing categorical industrial users, the report shall be submitted within 90 days following the date for final compliance with applicable categorical pretreatment standards. For new categorical industrial users, the report shall be due 30 days following the commencement of wastewater discharge into the POTW. These reports shall contain long-term production rates and actual production during the wastewater sampling periods; 19. All significant and categorical industrial users shall submit progress reports on compliance every six months. These reports shall include effluent sample analyses with the pollutant names and concentration or masses; average and maximum daily wastewater flows for all regulated processes and total flow for the reporting period; average and maximum daily production rates; and total production rate for the reporting period. Significant industrial users are required to notify the Director immediately of any changes at its facility affecting the potential for a slug discharge; 20. All required reports: BMRs, compliance reports, periodic reports on continued compliance, and sample data submittals, must be signed by an authorized representative of the user; 21. All reports required by this section must have an accompanying certification statement by a qualified professional stating whether the pretreatment standards are or are not being met as set forth in 40 CFR Section 403.12(b)(6); 22. Requirements for maintaining and retaining all records relating to wastewater monitoring, sample analyses, production, waste disposal, recycling, and waste minimization as specified by the Director; 23. Users subject to the reporting requirements of this ordinance shall retain, and make available for inspection and copying, all records of information obtained pursuant to any monitoring activities required by this ordinance, any additional records of information obtained pursuant to monitoring activities undertaken by the user independent of such requirements, and documentation associated with best management practices as approved by the City. Records shall include the date, exact place, method, and time of sampling, and the name of the person(s) taking the samples; the dates analyses were performed; who performed the analyses; the analytical techniques or methods used; and the results of such analyses. These records shall remain available for a period of at least three years. This period shall be automatically extended for the duration of any litigation concerning the user or the City, or where the user has been specifically notified of a longer retention period by the Director. 24. All wastewater samples must be representative of the industrial user's discharge and must be reported to the City when obtained at the permitted discharge sample location or outfall. Wastewater monitoring and flow measurement facilities shall be properly operated, kept clean, and maintained in good working order at all times. The failure of a user to keep its monitoring facility in good working order shall not be grounds for the user to claim that sample results are unrepresentative of its discharge. 25. Requirements for notification of slug or accidental discharges and significant changes in volume or characteristics of the pollutants discharged; 26. Statement of applicable civil and criminal penalties for violation of pretreatment standards and requirements and this chapter; and 27. Other conditions as deemed appropriate by the Director to ensure compliance with this chapter.
(Ord. 7551 §39, 2021; Ord. 7362 §6, 2017; Ord. 7099 §5, 2010; Ord. 7032 §2, 2009; Ord. 6377 §2 (part), 2002; Ord. 6232 §2 (part), 1995)
Ask a question about Riverside law
Corpus searches the Riverside sections it holds and shows the ones that match, with their citations. Free, no sign-in.
